HTS Heading 8306
Bells, gongs and the like, nonelectric, of base metal; statuettes and other ornaments, of base metal; photograph, picture or similar frames, of base metal; mirrors of base metal; and base metal parts thereof
All 4 HTS codes under heading 8306 (bells, gongs and the like, nonelectric), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.
Every line of heading 8306
- 8306 Bells, gongs and the like, nonelectric, of base metal; statuettes and other ornaments, of base metal; photograph, picture or similar frames, of base metal; mirrors of base metal; and base metal parts thereof.
- 8306.10.00.00 Bells, gongs and the like, and parts thereof (kg): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 8306.21.00.00 Plated with precious metal, and parts thereof (kg): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 8306.29.00.00 Other (under: Statuettes and other ornaments, and parts thereof) (kg): General Free; Special none; Column 2 46%.
- 8306.30.00.00 Photograph, picture or similar frames; mirrors; and parts thereof (kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.