HTS Heading 8413
Pumps for liquids, whether or not fitted with a measuring device; liquid elevators; part thereof
All 45 HTS codes under heading 8413 (pumps for liquids), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.
Every line of heading 8413
- 8413 Pumps for liquids, whether or not fitted with a measuring device; liquid elevators; part thereof.
- 8413.11.00.00 Pumps for dispensing fuel or lubricants, of the type used in filling-stations or in garages (No.): General Free; Special none; Column 2 35%.
- 8413.19.00.00 Other (under: Pumps fitted or designed to be fitted with a measuring device) (No.): General Free; Special none; Column 2 35%.
- 8413.20.00.00 Hand pumps, other than those of subheading 8413.11 or 8413.19 (No.): General Free; Special none; Column 2 35%.
- 8413.30 Fuel, lubricating or cooling medium pumps for internal combustion piston engines.
- 8413.30.10.00 Fuel-injection pumps for compression-ignition engines (No.): General 2.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8413.30.90 Other (under: Fuel, lubricating or cooling medium pumps for internal combustion piston engines): General 2.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8413.30.90.30 Fuel pumps (under: Other) (No.).
- 8413.30.90.60 Lubricating pumps (under: Other) (No.).
- 8413.30.90.90 Other (under: Other) (No.).
- 8413.40.00.00 Concrete pumps (under: Pumps for liquids, whether or not fitted with a measuring device; liquid elevators; part thereof) (No.): General Free; Special none; Column 2 35%.
- 8413.50.00 Other reciprocating positive displacement pumps: General Free; Special none; Column 2 35%.
- 8413.50.00.10 Oil well and oil field pumps (under: Other reciprocating positive displacement pumps) (No.).
- 8413.50.00.50 Diaphragm pumps (under: Other reciprocating positive displacement pumps) (No.).
- 8413.50.00.70 Radial piston type (under: Hydraulic fluid power pumps) (No.).
- 8413.50.00.80 Other (under: Hydraulic fluid power pumps) (No.).
- 8413.50.00.90 Other (under: Other) (No.).
- 8413.60.00 Other rotary positive displacement pumps: General Free; Special none; Column 2 35%.
- 8413.60.00.20 Vane type (under: Hydraulic fluid power pumps) (No.).
- 8413.60.00.30 Gear type (under: Hydraulic fluid power pumps) (No.).
- 8413.60.00.40 Other (under: Hydraulic fluid power pumps) (No.).
- 8413.60.00.50 Oil well and oil field pumps (under: Other) (No.).
- 8413.60.00.70 Roller pumps (under: Other) (No.).
- 8413.60.00.90 Other (under: Other) (No.).
- 8413.70 Other centrifugal pumps (under: Pumps for liquids, whether or not fitted with a measuring device; liquid elevators; part thereof).
- 8413.70.10.00 Stock pumps imported for use with machines for making cellulosic pulp, paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8413.70.20 Other (under: Other centrifugal pumps): General Free; Special none; Column 2 35%.
- 8413.70.20.04 Submersible pumps (under: Other) (No.).
- 8413.70.20.05 With discharge outlet under 5.08 cm in diameter (No.).
- 8413.70.20.15 With discharge outlet 5.08 cm or over in diameter (No.).
- 8413.70.20.22 With discharge outlet under 7.6 cm in diameter (No.).
- 8413.70.20.25 With discharge outlet 7.6 cm or over in diameter (No.).
- 8413.70.20.30 Single-stage, double-suction (under: Other) (No.).
- 8413.70.20.40 Multi-stage, single- or double-suction (No.).
- 8413.70.20.90 Other (under: Other) (No.).
- 8413.81.00 Pumps (under: Other pumps; liquid elevators): General Free; Special none; Column 2 35%.
- 8413.81.00.20 Turbine pumps (under: Pumps) (No.).
- 8413.81.00.30 Household water systems, self-contained; and windmill pumps (No.).
- 8413.81.00.40 Other (under: Pumps) (No.).
- 8413.82.00.00 Liquid elevators (under: Other pumps; liquid elevators) (No.): General Free; Special none; Column 2 35%.
- 8413.91 Of pumps (under: Parts).
- 8413.91.10.00 Of fuel-injection pumps for compression-ignition engines (kg): General 2.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8413.91.20.00 Of stock pumps imported for use with machines for making cellulosic pulp, paper or paperboard (kg): General Free; Special none; Column 2 35%.
- 8413.91.90 Other (under: Of pumps): General Free; Special none; Column 2 35%.
- 8413.91.90.15 Of subheading 8413.30.90 (under: Other) (kg).
- 8413.91.90.20 Fluid end blocks (under: Of hydraulic fluid power pumps) (No.).
- 8413.91.90.29 Other (under: Of hydraulic fluid power pumps) (kg).
- 8413.91.90.31 Sucker rods of a kind described in statistical note 3 to this chapter (kg).
- 8413.91.90.39 Other (under: Of subheading 8413.50.00) (kg).
- 8413.91.90.41 Of subheading 8413.30.90 (under: Of copper or copper alloys as described in statistical note 4 to this chapter) (kg).
- 8413.91.90.44 Of hydraulic fluid power pumps (kg).
- 8413.91.90.46 Of subheading 8413.50.00 (under: Of copper or copper alloys as described in statistical note 4 to this chapter) (kg).
- 8413.91.90.59 Other (under: Of copper or copper alloys as described in statistical note 4 to this chapter) (kg).
- 8413.91.90.99 Other (under: Other) (kg).
- 8413.92.00.00 Of liquid elevators (under: Parts) (kg): General Free; Special none; Column 2 35%.
From MFG Calcs data: Pumps for liquids
U.S. imports of pumps for liquids (heading 8413) came to $12.52B in 2025, with $1.78B in calculated duty: an effective duty of 14.2%, every duty included.
Effective duty in Sep 2026: 12.9%, against 20.2% in Sep 2025.
Largest sources in 2025: Mexico $2.68B at 7.2% effective duty; China $1.66B at 46.4% effective duty; Germany $1.43B at 10.4% effective duty; Japan $1.35B at 9.8% effective duty; Canada $1.05B at 4.3% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.