HTS Heading 8414
Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan, whether or not fitted with filters; gas-tight biological safety cabinets, whether or not fitted with filters; parts thereof
All 57 HTS codes under heading 8414 (air or vacuum pumps), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.7%.
Every line of heading 8414
- 8414 Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan, whether or not fitted with filters; gas-tight biological safety cabinets, whether or not fitted with filters; parts thereof.
- 8414.10.00.00 Vacuum pumps (under: Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan, whether or not fitted with filters; gas-tight biological safety cabinets, whether or not fitted with filters; parts thereof) (No.): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.20.00.00 Hand- or foot-operated air pumps (No.): General 3.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.30 Compressors of a kind used in refrigerating equipment (including air conditioning).
- 8414.30.40.00 Not exceeding 1/4 horsepower (under: Compressors of a kind used in refrigerating equipment (including air conditioning)) (No.): General Free; Special none; Column 2 35%.
- 8414.30.80 Other (under: Compressors of a kind used in refrigerating equipment (including air conditioning)): General Free; Special none; Column 2 35%.
- 8414.30.80.10 Not exceeding 200 horsepower (under: Screw type) (No.).
- 8414.30.80.20 Exceeding 200 horsepower (under: Screw type) (No.).
- 8414.30.80.30 For motor vehicles (under: For all refrigerants except ammonia) (No.).
- 8414.30.80.50 Exceeding 1/4 horsepower but not exceeding 1 horsepower (No.).
- 8414.30.80.60 Exceeding 1 horsepower but not exceeding 3 horsepower (No.).
- 8414.30.80.70 Exceeding 3 horsepower but not exceeding 10 horsepower (No.).
- 8414.30.80.80 Exceeding 10 horsepower (under: Other) (No.).
- 8414.30.80.90 For ammonia (under: Other) (No.).
- 8414.40.00.00 Air compressors mounted on a wheeled chassis for towing (No.): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.51 Table, floor, wall, window, ceiling or roof fans, with a self-contained electric motor of an output not exceeding 125 W.
- 8414.51.30.00 Ceiling fans for permanent installation (No.): General 4.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.51.90 Other (under: Table, floor, wall, window, ceiling or roof fans, with a self-contained electric motor of an output not exceeding 125 W): General 4.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.51.90.60 For permanent installation (under: Other) (No.).
- 8414.51.90.90 Other (under: Other) (No.).
- 8414.59 Other (under: Fans).
- 8414.59.10.00 Blowers for pipe organs (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8414.59.15.00 Fans of a kind used solely or principally for cooling microprocessors, telecommunications apparatus, automatic data processing machines or units of automatic data processing machines (No.): General Free; Special none; Column 2 35%.
- 8414.59.30.00 Turbochargers and superchargers (No.): General 2.3%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.59.65 Other (under: Other): General 2.3%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.59.65.40 Suitable for use with motor vehicles (No.).
- 8414.59.65.60 Centrifugal (under: Other) (No.).
- 8414.59.65.90 Axial (under: Other) (No.).
- 8414.59.65.95 Other (under: Other) (No.).
- 8414.60.00.00 Hoods having a maximum horizontal side not exceeding 120 cm (No.): General Free; Special none; Column 2 35%.
- 8414.70.00.00 Gas-tight biological safety cabinets (No.): General Free; Special none; Column 2 35%.
- 8414.80 Other, except parts (under: Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan, whether or not fitted with filters; gas-tight biological safety cabinets, whether or not fitted with filters; parts thereof).
- 8414.80.05.00 Turbochargers and superchargers (No.): General Free; Special none; Column 2 35%.
- 8414.80.16 Other (under: Air compressors): General Free; Special none; Column 2 35%.
- 8414.80.16.05 Not exceeding 746 W (under: Reciprocating) (No.).
- 8414.80.16.15 Exceeding 746 W but not exceeding 4.48 kW (No.).
- 8414.80.16.25 Exceeding 4.48 kW but not exceeding 8.21 kW (No.).
- 8414.80.16.35 Exceeding 8.21 kW but not exceeding 11.19 kW (No.).
- 8414.80.16.40 Exceeding 11.19 kW but not exceeding 19.4 kW (No.).
- 8414.80.16.45 Exceeding 19.4 kW but not exceeding 74.6 kW (No.).
- 8414.80.16.55 Exceeding 74.6 kW (under: Reciprocating) (No.).
- 8414.80.16.60 Not exceeding 11.19 kW (under: Rotary) (No.).
- 8414.80.16.65 Exceeding 11.19 kW but under 22.38 kW (No.).
- 8414.80.16.70 22.38 kW and over but not exceeding 74.6 kW (No.).
- 8414.80.16.75 Exceeding 74.6 kW (under: Rotary) (No.).
- 8414.80.16.80 Other (under: Stationary) (No.).
- 8414.80.16.85 Under 0.57 cubic meters per minute (No.).
- 8414.80.16.90 Other (under: Portable) (No.).
- 8414.80.20 Other compressors (under: Other, except parts): General Free; Special none; Column 2 35%.
- 8414.80.20.05 Refrigerant recovery units (under: Other compressors) (No.).
- 8414.80.20.15 Centrifugal and axial (under: Other) (No.).
- 8414.80.20.55 Not exceeding 186.5 kW (under: Other, including reciprocating and rotary) (No.).
- 8414.80.20.65 Exceeding 186.5 kW but not exceeding 746 kW (No.).
- 8414.80.20.75 Exceeding 746 kW (under: Other, including reciprocating and rotary) (No.).
- 8414.80.90.00 Other (under: Other, except parts) (No.): General 3.7%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.90 Parts (under: Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan, whether or not fitted with filters; gas-tight biological safety cabinets, whether or not fitted with filters; parts thereof).
- 8414.90.10 Of fans (including blowers) and ventilating or recycling hoods: General 4.7%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8414.90.10.40 Of fans of subheading 8414.51 (kg).
- 8414.90.10.80 Other (under: Of fans (including blowers) and ventilating or recycling hoods) (kg).
- 8414.90.30.00 Stators and rotors of goods of subheading 8414.30 (No.): General Free; Special none; Column 2 35%.
- 8414.90.41 Other (under: Of compressors): General Free; Special none; Column 2 35%.
- 8414.90.41.20 Compressor housings (under: Of refrigerating and air conditioning compressors) (No.).
- 8414.90.41.40 Other (under: Of refrigerating and air conditioning compressors) (kg).
- 8414.90.41.45 Compressor housings (under: Of compressors of subheading 8414.40) (No.).
- 8414.90.41.55 Other (under: Of compressors of subheading 8414.40) (kg).
- 8414.90.41.65 Compressor housings (under: Other) (No.).
- 8414.90.41.80 Impeller covers and hubs (under: Other) (No.).
- 8414.90.41.90 Other (under: Other) (kg).
- 8414.90.91 Other (under: Parts): General Free; Special none; Column 2 35%.
- 8414.90.91.40 Of vacuum pumps (under: Other) (kg).
- 8414.90.91.80 Other (under: Other) (kg).
From MFG Calcs data: Compressors and fans
U.S. imports of compressors and fans (heading 8414) came to $14.95B in 2025, with $2.20B in calculated duty: an effective duty of 14.7%, every duty included.
Effective duty in Sep 2026: 13.3%, against 19.7% in Sep 2025.
Largest sources in 2025: Mexico $3.46B at 7.3% effective duty; China $3.02B at 35.7% effective duty; Germany $1.25B at 9.5% effective duty; Japan $1.15B at 12.7% effective duty; Vietnam $696M at 11.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.