HTS Heading 8415
Air conditioning machines, comprising a motor-driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated; parts thereof
All 30 HTS codes under heading 8415 (air conditioning machines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.2%.
Every line of heading 8415
- 8415 Air conditioning machines, comprising a motor-driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated; parts thereof.
- 8415.10 Of a kind designed to be fixed to a window, wall, ceiling or floor, self-contained or “split system”.
- 8415.10.30 Self-contained (under: Of a kind designed to be fixed to a window, wall, ceiling or floor, self-contained or “split system”): General Free; Special none; Column 2 35%.
- 8415.10.30.40 Less than 2.93 kW per hour (under: Self-contained) (No.).
- 8415.10.30.60 2.93 kW per hour or greater but less than 4.98 kW per hour (No.).
- 8415.10.30.80 4.98 kW per hour or greater (under: Self-contained) (No.).
- 8415.10.60.00 Incorporating a refrigerating unit and a valve for reversal of the cooling/heat cycle (reversible heat pumps) (No.): General 1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.10.90.00 Other (under: Other) (No.): General 2.2%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.20.00.00 Of a kind used for persons, in motor vehicles (No.): General 1.4%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.81.01 Incorporating a refrigerating unit and a valve for reversal of the cooling/heat cycle (reversible heat pumps): General 1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.81.01.10 Not exceeding 17.58 kW per hour (No.).
- 8415.81.01.20 Exceeding 17.58 kW per hour (under: Self-contained) (No.).
- 8415.81.01.30 Other (under: Incorporating a refrigerating unit and a valve for reversal of the cooling/heat cycle (reversible heat pumps)) (No.).
- 8415.82.01 Other, incorporating a refrigerating unit: General 2.2%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.82.01.05 Not exceeding 17.58 kW per hour (No.).
- 8415.82.01.10 Exceeding 17.58 kW per hour (under: Self-contained machines and remote condenser type air conditioners other than year-round units) (No.).
- 8415.82.01.15 Not exceeding 17.58 kW per hour (No.).
- 8415.82.01.20 Exceeding 17.58 kW per hour (under: Year-round units (heating and cooling)) (No.).
- 8415.82.01.30 Room fan coil units (under: Room or central station air conditioning units for use with water chillers) (No.).
- 8415.82.01.35 Central station air handlers (under: Room or central station air conditioning units for use with water chillers) (No.).
- 8415.82.01.40 Other (under: Room or central station air conditioning units for use with water chillers) (No.).
- 8415.82.01.55 With a rated water removal capacity of less than 35 liters over a 24 hour period (No.).
- 8415.82.01.60 Other (under: Dehumidifiers) (No.).
- 8415.82.01.70 Other air conditioning machines incorporating a refrigerating unit (No.).
- 8415.83.00 Not incorporating a refrigerating unit: General 1.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.83.00.50 Not exceeding 17.58 kW per hour (No.).
- 8415.83.00.60 Exceeding 17.58 kW per hour (under: Condensing units) (No.).
- 8415.83.00.70 Other (under: Heat exchangers including condensing units) (No.).
- 8415.83.00.90 Other air conditioning machines not incorporating a refrigerating unit (No.).
- 8415.90 Parts (under: Air conditioning machines, comprising a motor-driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated; parts thereof).
- 8415.90.40.00 Chassis, chassis bases and outer cabinets (No.): General 1.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8415.90.80 Other (under: Parts): General 1.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) See 9921.01.01, 9921.01.02 (JP); Column 2 35%.
- 8415.90.80.10 Of copper or copper alloys (under: Air conditioning evaporator coils) (No.).
- 8415.90.80.20 Other (under: Air conditioning evaporator coils) (No.).
- 8415.90.80.45 Of automotive air conditioners (kg).
- 8415.90.80.50 Of copper or copper alloys (under: Of heat pumps) (kg).
- 8415.90.80.70 Other (under: Of heat pumps) (kg).
- 8415.90.80.85 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.