HTS Heading 8416

Furnace burners for liquid fuel, for pulverized solid fuel or for gas; mechanical stokers, including their mechanical grates, mechanical ash dischargers and similar appliances; parts thereof

All 5 HTS codes under heading 8416 (furnace burners for liquid fuel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8416

  • 8416 Furnace burners for liquid fuel, for pulverized solid fuel or for gas; mechanical stokers, including their mechanical grates, mechanical ash dischargers and similar appliances; parts thereof.
  • 8416.10.00.00 Furnace burners for liquid fuel (No.): General Free; Special none; Column 2 27.5%.
  • 8416.20.00 Other furnace burners, including combination burners: General Free; Special none; Column 2 27.5%.
  • 8416.20.00.40 Gas burners (under: Other furnace burners, including combination burners) (No.).
  • 8416.20.00.80 Other (under: Other furnace burners, including combination burners) (No.).
  • 8416.30.00.00 Mechanical stokers, including their mechanical grates, mechanical ash dischargers and similar appliances (No.): General Free; Special none; Column 2 27.5%.
  • 8416.90.00.00 Parts (under: Furnace burners for liquid fuel, for pulverized solid fuel or for gas; mechanical stokers, including their mechanical grates, mechanical ash dischargers and similar appliances; parts thereof) (kg): General Free; Special none; Column 2 27.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.