HTS Heading 8424
Mechanical appliances (whether or not hand operated) for projecting, dispersing or spraying liquids or powders; fire extinguishers, whether or not charged; spray guns and similar appliances; steam or sand blasting machines and similar jet projecting machines; parts thereof
All 20 HTS codes under heading 8424 (mechanical appliances), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%.
Every line of heading 8424
- 8424 Mechanical appliances (whether or not hand operated) for projecting, dispersing or spraying liquids or powders; fire extinguishers, whether or not charged; spray guns and similar appliances; steam or sand blasting machines and similar jet projecting machines; parts thereof.
- 8424.10.00.00 Fire extinguishers, whether or not charged (No.): General Free; Special none; Column 2 35%.
- 8424.20 Spray guns and similar appliances.
- 8424.20.10.00 Simple piston pump sprays and powder bellows (No.): General 2.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8424.20.90.00 Other (under: Spray guns and similar appliances) (kg): General Free; Special none; Column 2 35%.
- 8424.30 Steam or sand blasting machines and similar jet projecting machines.
- 8424.30.10.00 Sand blasting machines (under: Steam or sand blasting machines and similar jet projecting machines) (No.): General Free; Special none; Column 2 Free.
- 8424.30.90 Other (under: Steam or sand blasting machines and similar jet projecting machines): General Free; Special none; Column 2 35%.
- 8424.30.90.10 Powered by a gasoline-fueled internal combustion engine (kg).
- 8424.30.90.90 Other (under: Other) (kg).
- 8424.41 Portable sprayers (under: Agricultural or horticultural sprayers).
- 8424.41.10.00 Sprayers (except sprayers, self-contained, having a capacity not over 20 liters) (No.): General Free; Special none; Column 2 Free.
- 8424.41.90.00 Other (under: Portable sprayers) (No.): General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8424.49.00.00 Other (under: Agricultural or horticultural sprayers) (No.): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8424.82.00 Agricultural or horticultural: General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8424.82.00.10 Self-propelled, center pivot (under: Irrigation equipment) (No.).
- 8424.82.00.20 Other (under: Irrigation equipment) (No.).
- 8424.82.00.90 Other (under: Agricultural or horticultural) (No.).
- 8424.89.10.00 Mechanical appliances for projecting, dispersing or spraying, of a kind used solely or principally for the manufacture of printed circuits or printed circuit assemblies (No.): General Free; Special none; Column 2 35%.
- 8424.89.90.00 Other (under: Other appliances) (No.): General 1.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8424.90 Parts (under: Mechanical appliances (whether or not hand operated) for projecting, dispersing or spraying liquids or powders; fire extinguishers, whether or not charged; spray guns and similar appliances; steam or sand blasting machines and similar jet projecting machines; parts thereof).
- 8424.90.05.00 Of fire extinguishers (under: Parts) (kg): General Free; Special none; Column 2 35%.
- 8424.90.10.00 Of simple piston pump sprays and powder bellows (kg): General 2.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8424.90.20.00 Of sand blasting machines (under: Parts) (kg): General Free; Special none; Column 2 Free.
- 8424.90.90 Other (under: Parts): General Free; Special none; Column 2 35%.
- 8424.90.90.10 Powered by a gasoline-fueled internal combustion engine (kg).
- 8424.90.90.20 Other (under: Of steam and similar jet projecting machines) (kg).
- 8424.90.90.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.