HTS Heading 8425

Pulley tackle and hoists other than skip hoists; winches and capstans; jacks

All 7 HTS codes under heading 8425 (pulley tackle and hoists other than skip hoists), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8425

  • 8425 Pulley tackle and hoists other than skip hoists; winches and capstans; jacks.
  • 8425.11.00.00 Powered by electric motor (under: Pulley tackle and hoists other than skip hoists or hoists of a kind used for raising vehicles) (No.): General Free; Special none; Column 2 35%.
  • 8425.19.00.00 Other (under: Pulley tackle and hoists other than skip hoists or hoists of a kind used for raising vehicles) (No.): General Free; Special none; Column 2 35%.
  • 8425.31.01.00 Powered by electric motor (under: Winches; capstans) (No.): General Free; Special none; Column 2 35%.
  • 8425.39.01.00 Other (under: Winches; capstans) (No.): General Free; Special none; Column 2 35%.
  • 8425.41.00.00 Built-in jacking systems of a type used in garages (No.): General Free; Special none; Column 2 35%.
  • 8425.42.00.00 Other jacks and hoists, hydraulic (No.): General Free; Special none; Column 2 35%.
  • 8425.49.00.00 Other (under: Jacks; hoists of a kind used for raising vehicles) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.