HTS Heading 8426

Ships' derricks; cranes, including cable cranes; mobile lifting frames, straddle carriers and works trucks fitted with a crane

All 12 HTS codes under heading 8426 (ships' derricks), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8426

  • 8426 Ships' derricks; cranes, including cable cranes; mobile lifting frames, straddle carriers and works trucks fitted with a crane.
  • 8426.11.00.00 Overhead traveling cranes on fixed support (No.): General Free; Special none; Column 2 35%.
  • 8426.12.00.00 Mobile lifting frames on tires and straddle carriers (No.): General Free; Special none; Column 2 35%.
  • 8426.19.00.00 Other (under: Overhead traveling cranes, transporter cranes, gantry cranes, bridge cranes, mobile lifting frames and straddle carriers) (No.): General Free; Special none; Column 2 35%.
  • 8426.20.00.00 Tower cranes (under: Ships' derricks; cranes, including cable cranes; mobile lifting frames, straddle carriers and works trucks fitted with a crane) (No.): General Free; Special none; Column 2 35%.
  • 8426.30.00.00 Portal or pedestal jib cranes (No.): General Free; Special none; Column 2 35%.
  • 8426.41.00 On tires (under: Other machinery, self-propelled): General Free; Special none; Column 2 35%.
  • 8426.41.00.05 Works trucks fitted with a crane (No.).
  • 8426.41.00.10 Cable operated (under: Other) (No.).
  • 8426.41.00.90 Other (under: Other) (No.).
  • 8426.49.00 Other (under: Other machinery, self-propelled): General Free; Special none; Column 2 35%.
  • 8426.49.00.10 Cable operated (under: Other) (No.).
  • 8426.49.00.90 Other (under: Other) (No.).
  • 8426.91.00.00 Designed for mounting on road vehicles (No.): General Free; Special none; Column 2 35%.
  • 8426.99.00.00 Other (under: Other machinery) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.