HTS Heading 8427
Fork-lift trucks; other works trucks fitted with lifting or handling equipment
All 13 HTS codes under heading 8427 (fork-lift trucks), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8427
- 8427 Fork-lift trucks; other works trucks fitted with lifting or handling equipment.
- 8427.10 Self-propelled trucks powered by an electric motor.
- 8427.10.40 Rider-type, counterbalanced fork-lift trucks: General Free; Special none; Column 2 35%.
- 8427.10.40.10 Powered by at least one hydrogen fuel cell (No.).
- 8427.10.40.90 Other (under: Rider-type, counterbalanced fork-lift trucks) (No.).
- 8427.10.80 Other (under: Self-propelled trucks powered by an electric motor): General Free; Special none; Column 2 35%.
- 8427.10.80.20 Aerial work platforms of a kind described in statistical note 5 to this chapter (No.).
- 8427.10.80.30 Other (under: Operator riding) (No.).
- 8427.10.80.40 Aerial work platforms of a kind described in statistical note 5 to this chapter (No.).
- 8427.10.80.50 Other (under: Automated guided vehicle (AGV)) (No.).
- 8427.10.80.70 Aerial work platforms of a kind described in statistical note 5 to this chapter (No.).
- 8427.10.80.95 Other (under: Other) (No.).
- 8427.20 Other self-propelled trucks (under: Fork-lift trucks; other works trucks fitted with lifting or handling equipment).
- 8427.20.40.00 Rider-type, counterbalanced fork-lift trucks (No.): General Free; Special none; Column 2 35%.
- 8427.20.80 Other (under: Other self-propelled trucks): General Free; Special none; Column 2 35%.
- 8427.20.80.20 Aerial work platforms of a kind described in statistical note 5 to this chapter (No.).
- 8427.20.80.90 Other (under: Other) (No.).
- 8427.90.00 Other trucks (under: Fork-lift trucks; other works trucks fitted with lifting or handling equipment): General Free; Special none; Column 2 35%.
- 8427.90.00.20 Aerial work platforms of a kind described in statistical note 5 to this chapter (No.).
- 8427.90.00.90 Other (under: Other trucks) (No.).
From MFG Calcs data: Lifting and handling equipment
U.S. imports of lifting and handling equipment (headings 8427, 8428) came to $13.80B in 2025, with $1.57B in calculated duty: an effective duty of 11.4%, every duty included.
Effective duty in Sep 2026: 18.0%, against 21.1% in Sep 2025.
Largest sources in 2025: Mexico $2.30B at 4.2% effective duty; Japan $1.92B at 14.2% effective duty; Canada $1.47B at 1.8% effective duty; Germany $1.37B at 12.5% effective duty; South Korea $1.27B at 6.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.