HTS Heading 8428
Other lifting, handling, loading or unloading machinery (for example, elevators, escalators, conveyors, teleferics)
All 12 HTS codes under heading 8428 (other lifting, handling), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8428
- 8428 Other lifting, handling, loading or unloading machinery (for example, elevators, escalators, conveyors, teleferics).
- 8428.10.00.00 Passenger or freight elevators other than continuous action; skip hoists (No.): General Free; Special none; Column 2 35%.
- 8428.20.00 Pneumatic elevators and conveyors: General Free; Special none; Column 2 35%.
- 8428.20.00.10 Conveyors (under: Pneumatic elevators and conveyors) (No.).
- 8428.20.00.50 Elevators (under: Pneumatic elevators and conveyors) (No.).
- 8428.31.00.00 Specially designed for underground use (No.): General Free; Special none; Column 2 35%.
- 8428.32.00.00 Other, bucket type (under: Other continuous-action elevators and conveyors, for goods or materials) (No.): General Free; Special none; Column 2 35%.
- 8428.33.00.00 Other, belt type (under: Other continuous-action elevators and conveyors, for goods or materials) (No.): General Free; Special none; Column 2 35%.
- 8428.39.00.00 Other (under: Other continuous-action elevators and conveyors, for goods or materials) (No.): General Free; Special none; Column 2 35%.
- 8428.40.00.00 Escalators and moving walkways (No.): General Free; Special none; Column 2 35%.
- 8428.60.00.00 Teleferics, chair lifts, ski draglines; traction mechanisms for funiculars (No.): General Free; Special none; Column 2 35%.
- 8428.70.00.00 Industrial robots (under: Other lifting, handling, loading or unloading machinery (for example, elevators, escalators, conveyors, teleferics)) (No.): General Free; Special none; Column 2 35%.
- 8428.90.03 Other machinery (under: Other lifting, handling, loading or unloading machinery (for example, elevators, escalators, conveyors, teleferics)): General Free; Special none; Column 2 35%.
- 8428.90.03.10 Woodland log handling equipment (other than skidders) (No.).
- 8428.90.03.90 Other (under: Other machinery) (No.).
From MFG Calcs data: Lifting and handling equipment
U.S. imports of lifting and handling equipment (headings 8427, 8428) came to $13.80B in 2025, with $1.57B in calculated duty: an effective duty of 11.4%, every duty included.
Effective duty in Sep 2026: 18.0%, against 21.1% in Sep 2025.
Largest sources in 2025: Mexico $2.30B at 4.2% effective duty; Japan $1.92B at 14.2% effective duty; Canada $1.47B at 1.8% effective duty; Germany $1.37B at 12.5% effective duty; South Korea $1.27B at 6.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.