HTS Heading 8429
Self-propelled bulldozers, angledozers, graders, levelers, scrapers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers
All 42 HTS codes under heading 8429 (self-propelled bulldozers, angledozers), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8429
- 8429 Self-propelled bulldozers, angledozers, graders, levelers, scrapers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers.
- 8429.11.00 Track laying (under: Bulldozers and angledozers): General Free; Special none; Column 2 35%.
- 8429.11.00.10 New (under: Track laying) (No.).
- 8429.11.00.90 Used or rebuilt (under: Track laying) (No.).
- 8429.19.00 Other (under: Bulldozers and angledozers): General Free; Special none; Column 2 35%.
- 8429.19.00.10 New (under: Other) (No.).
- 8429.19.00.90 Used or rebuilt (under: Other) (No.).
- 8429.20.00.00 Graders and levelers (under: Self-propelled bulldozers, angledozers, graders, levelers, scrapers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers) (No.): General Free; Special none; Column 2 35%.
- 8429.30.00 Scrapers (under: Self-propelled bulldozers, angledozers, graders, levelers, scrapers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers): General Free; Special none; Column 2 35%.
- 8429.30.00.20 Not exceeding 13.7 m3 (under: New) (No.).
- 8429.30.00.40 Exceeding 13.7 m3 (under: New) (No.).
- 8429.30.00.60 Used or rebuilt (under: Scrapers) (No.).
- 8429.40.00 Tamping machines and road rollers: General Free; Special none; Column 2 35%.
- 8429.40.00.20 Vibratory (under: New) (No.).
- 8429.40.00.40 Other (under: New) (No.).
- 8429.40.00.60 Used or rebuilt (under: Tamping machines and road rollers) (No.).
- 8429.51 Front-end shovel loaders (under: Mechanical shovels, excavators and shovel loaders).
- 8429.51.10 Wheel-type (under: Front-end shovel loaders): General Free; Special none; Column 2 35%.
- 8429.51.10.05 2 wheel drive (under: Integral tractor shovel loaders, rear engine mounted) (No.).
- 8429.51.10.15 Under 1.5 m3 (under: 4 wheel drive with a bucket capacity of) (No.).
- 8429.51.10.25 At least 1.5 m3 but under 2.2 m3 (No.).
- 8429.51.10.30 At least 2.2 m3 but under 2.9 m3 (No.).
- 8429.51.10.35 At least 2.9 m3 but under 3.8 m3 (No.).
- 8429.51.10.40 At least 3.8 m3 but under 5.2 m3 (No.).
- 8429.51.10.45 At least 5.2 m3 but under 7.6 m3 (No.).
- 8429.51.10.50 At least 7.6 m3 but under 11.4 m3 (No.).
- 8429.51.10.55 11.4 m3 and over (under: 4 wheel drive with a bucket capacity of) (No.).
- 8429.51.10.60 Other (under: New) (No.).
- 8429.51.10.65 Used or rebuilt (under: Wheel-type) (No.).
- 8429.51.50 Other (under: Front-end shovel loaders): General Free; Special none; Column 2 35%.
- 8429.51.50.10 Less than 44.7 kW (under: New) (No.).
- 8429.51.50.20 At least 44.7 kW but under 67.1 kW (No.).
- 8429.51.50.30 At least 67.1 kW but under 93.2 kW (No.).
- 8429.51.50.40 At least 93.2 kW but under 119.3 kW (No.).
- 8429.51.50.50 119.3 kW and over (under: New) (No.).
- 8429.51.50.60 Used or rebuilt (under: Other) (No.).
- 8429.52 Machinery with a 360˚ revolving superstructure.
- 8429.52.10 Backhoes, shovels, clamshells and draglines: General Free; Special none; Column 2 35%.
- 8429.52.10.10 Hydraulic (under: Crawler mounted) (No.).
- 8429.52.10.20 Other (under: Crawler mounted) (No.).
- 8429.52.10.30 Hydraulic (under: Other) (No.).
- 8429.52.10.40 Other (under: Other) (No.).
- 8429.52.10.50 Used or rebuilt (under: Backhoes, shovels, clamshells and draglines) (No.).
- 8429.52.50 Other (under: Machinery with a 360˚ revolving superstructure): General Free; Special none; Column 2 35%.
- 8429.52.50.10 New (under: Other) (No.).
- 8429.52.50.90 Used or rebuilt (under: Other) (No.).
- 8429.59 Other (under: Mechanical shovels, excavators and shovel loaders).
- 8429.59.10 Backhoes, shovels, clamshells and draglines: General Free; Special none; Column 2 35%.
- 8429.59.10.30 Backhoes (under: New) (No.).
- 8429.59.10.60 Other (under: New) (No.).
- 8429.59.10.90 Used or rebuilt (under: Backhoes, shovels, clamshells and draglines) (No.).
- 8429.59.50 Other (under: Other): General Free; Special none; Column 2 35%.
- 8429.59.50.20 Ladder type (under: Ditchers and trenchers) (No.).
- 8429.59.50.40 Other (under: Ditchers and trenchers) (No.).
- 8429.59.50.60 Other (under: New) (No.).
- 8429.59.50.80 Used or rebuilt (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.