HTS Heading 8430
Other moving, grading, leveling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals or ores; pile-drivers and pile-extractors; snowplows and snowblowers
All 19 HTS codes under heading 8430 (other moving, grading, leveling), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8430
- 8430 Other moving, grading, leveling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals or ores; pile-drivers and pile-extractors; snowplows and snowblowers.
- 8430.10.00.00 Pile-drivers and pile-extractors (No.): General Free; Special none; Column 2 35%.
- 8430.20.00 Snowplows and snowblowers (under: Other moving, grading, leveling, scraping, excavating, tamping, compacting, extracting or boring machinery, for earth, minerals or ores; pile-drivers and pile-extractors; snowplows and snowblowers): General Free; Special none; Column 2 35%.
- 8430.20.00.30 Attachment type (under: Snowblowers) (No.).
- 8430.20.00.60 Other (under: Snowblowers) (No.).
- 8430.20.00.90 Other (under: Snowplows and snowblowers) (No.).
- 8430.31.00 Self-propelled (under: Coal or rock cutters and tunneling machinery): General Free; Special none; Column 2 35%.
- 8430.31.00.40 Rock breaking machines (under: Self-propelled) (No.).
- 8430.31.00.80 Other (under: Self-propelled) (No.).
- 8430.39.00 Other (under: Coal or rock cutters and tunneling machinery): General Free; Special none; Column 2 35%.
- 8430.39.00.40 Rock breaking machines (under: Other) (No.).
- 8430.39.00.80 Other (under: Other) (No.).
- 8430.41.00.00 Self-propelled (under: Other boring or sinking machinery) (No.): General Free; Special none; Column 2 35%.
- 8430.49 Other (under: Other boring or sinking machinery).
- 8430.49.40.00 Offshore oil and natural gas drilling and production platforms (kg): General Free; Special none; Column 2 45%.
- 8430.49.80 Other (under: Other): General Free; Special none; Column 2 35%.
- 8430.49.80.10 Rotary (under: For oil well and gas field drilling) (No.).
- 8430.49.80.20 Other (under: For oil well and gas field drilling) (No.).
- 8430.49.80.30 Rotary (under: For water well drilling) (No.).
- 8430.49.80.40 Other (under: For water well drilling) (No.).
- 8430.49.80.50 Other (under: Other) (No.).
- 8430.50 Other machinery, self-propelled.
- 8430.50.10.00 Peat excavators (under: Other machinery, self-propelled) (No.): General Free; Special none; Column 2 35%.
- 8430.50.50.00 Other (under: Other machinery, self-propelled) (No.): General Free; Special none; Column 2 35%.
- 8430.61.00.00 Tamping or compacting machinery (No.): General Free; Special none; Column 2 35%.
- 8430.69.01.00 Other (under: Other machinery, not self-propelled) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.