HTS Heading 8431
Parts suitable for use solely or principally with the machinery of headings 8425 to 8430
All 44 HTS codes under heading 8431 (parts suitable for use solely or principally), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8431
- 8431 Parts suitable for use solely or principally with the machinery of headings 8425 to 8430.
- 8431.10.00 Of machinery of heading 8425 (under: Parts suitable for use solely or principally with the machinery of headings 8425 to 8430): General Free; Special none; Column 2 35%.
- 8431.10.00.10 Of machinery of subheading 8425.11 or 8425.19 (No.).
- 8431.10.00.90 Other (under: Of machinery of heading 8425) (No.).
- 8431.20.00.00 Of machinery of heading 8427 (under: Parts suitable for use solely or principally with the machinery of headings 8425 to 8430) (No.): General Free; Special none; Column 2 35%.
- 8431.31.00 Of passenger or freight elevators other than continuous action, skip hoists or escalators: General Free; Special none; Column 2 35%.
- 8431.31.00.20 Of skip hoists (under: Of passenger or freight elevators other than continuous action, skip hoists or escalators) (No.).
- 8431.31.00.40 Of escalators (under: Of passenger or freight elevators other than continuous action, skip hoists or escalators) (No.).
- 8431.31.00.60 Other (under: Of passenger or freight elevators other than continuous action, skip hoists or escalators) (No.).
- 8431.39.00 Other (under: Of machinery of heading 8428): General Free; Special none; Column 2 35%.
- 8431.39.00.10 Of elevators and conveyors (under: Other) (No.).
- 8431.39.00.50 Of oil and gas field machinery (No.).
- 8431.39.00.70 Of the woodland log handling equipment of statistical reporting number 8428.90.0310 (No.).
- 8431.39.00.80 Other (under: Other) (No.).
- 8431.41.00 Buckets, shovels, grabs and grips: General Free; Special none; Column 2 35%.
- 8431.41.00.20 Shovel attachments (under: Buckets, shovels, grabs and grips) (No.).
- 8431.41.00.40 Clamshell (grappler) attachments (No.).
- 8431.41.00.60 Dragline buckets (under: Buckets, shovels, grabs and grips) (No.).
- 8431.41.00.80 Other (under: Buckets, shovels, grabs and grips) (No.).
- 8431.42.00.00 Bulldozer or angledozer blades (No.): General Free; Special none; Column 2 35%.
- 8431.43 Parts for boring or sinking machinery of subheading 8430.41 or 8430.49.
- 8431.43.40.00 Of offshore oil and natural gas drilling and production platforms (No.): General Free; Special none; Column 2 45%.
- 8431.43.80 Other (under: Parts for boring or sinking machinery of subheading 8430.41 or 8430.49): General Free; Special none; Column 2 35%.
- 8431.43.80.20 Tool joints, whether or not forged (No.).
- 8431.43.80.40 Drill pipe fitted with tool joints (No.).
- 8431.43.80.60 Other (under: Of oil and gas field machinery) (No.).
- 8431.43.80.90 Of other boring or sinking machinery (No.).
- 8431.49 Other (under: Of machinery of heading 8426, 8429 or 8430).
- 8431.49.10 Of machinery of heading 8426 (under: Other): General Free; Special none; Column 2 35%.
- 8431.49.10.10 Of machinery of subheadings 8426.11, 8426.19 and 8426.30 (No.).
- 8431.49.10.60 Of mobile lifting frames, straddle carriers and works trucks fitted with a crane (No.).
- 8431.49.10.70 Of copper or copper alloys (under: Other) (No.).
- 8431.49.10.80 Other (under: Other) (No.).
- 8431.49.90 Other (under: Other): General Free; Special none; Column 2 35%.
- 8431.49.90.05 Backhoe attachments (under: Attachments for mounting on machinery) (No.).
- 8431.49.90.10 Front-end loader attachments (under: Attachments for mounting on machinery) (No.).
- 8431.49.90.15 Rippers and rooters (under: Attachments for mounting on machinery) (No.).
- 8431.49.90.20 Other (under: Attachments for mounting on machinery) (No.).
- 8431.49.90.25 Cast axle housings (under: Parts of coal or rock cutters and tunneling machinery) (No.).
- 8431.49.90.32 Of copper or copper alloys (under: Other) (No.).
- 8431.49.90.34 Other (under: Other) (No.).
- 8431.49.90.35 Cast axle housings (under: Parts of backhoes, shovels, clamshells and draglines) (No.).
- 8431.49.90.36 Road wheels (under: Other) (No.).
- 8431.49.90.38 Wheel and tire assemblies (under: Other) (No.).
- 8431.49.90.39 Of copper or copper alloys (under: Other) (No.).
- 8431.49.90.41 Other (under: Other) (No.).
- 8431.49.90.45 Scraper bowls for scrapers of subheadings 8429.30 and 8430.69.01 (No.).
- 8431.49.90.50 Track links (under: Other) (No.).
- 8431.49.90.55 Cast axle housings (under: Other) (No.).
- 8431.49.90.81 Steel forgings (under: Other) (kg).
- 8431.49.90.84 Road wheels (under: Other) (No.).
- 8431.49.90.90 Wheel and tire assemblies (under: Other) (No.).
- 8431.49.90.92 Of copper or copper alloys (under: Other) (No.).
- 8431.49.90.94 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.