HTS Heading 8432
Agricultural, horticultural or forestry machinery for soil preparation or cultivation; lawn or sports ground rollers; parts thereof
All 22 HTS codes under heading 8432 (agricultural), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8432
- 8432 Agricultural, horticultural or forestry machinery for soil preparation or cultivation; lawn or sports ground rollers; parts thereof.
- 8432.10.00 Plows (under: Agricultural, horticultural or forestry machinery for soil preparation or cultivation; lawn or sports ground rollers; parts thereof): General Free; Special none; Column 2 Free.
- 8432.10.00.20 Moldboard plows except listers (No.).
- 8432.10.00.40 Disc plows (under: Plows) (No.).
- 8432.10.00.60 Other (under: Plows) (No.).
- 8432.21.00.00 Disc harrows (under: Harrows, scarifiers, cultivators, weeders and hoes) (No.): General Free; Special none; Column 2 Free.
- 8432.29.00 Other (under: Harrows, scarifiers, cultivators, weeders and hoes): General Free; Special none; Column 2 Free.
- 8432.29.00.40 Cultivators, tractor drawn or for tractor mounting (No.).
- 8432.29.00.60 Walk behind rotary tillers (under: Cultivators, weeders and hoes) (No.).
- 8432.29.00.80 Other (under: Cultivators, weeders and hoes) (No.).
- 8432.29.00.90 Other (under: Other) (No.).
- 8432.31.00 No-till direct seeders, planters and transplanters: General Free; Special none; Column 2 Free.
- 8432.31.00.10 Planters and transplanters (under: No-till direct seeders, planters and transplanters) (No.).
- 8432.31.00.90 Seeders (under: No-till direct seeders, planters and transplanters) (No.).
- 8432.39.00 Other (under: Seeders, planters and transplanters): General Free; Special none; Column 2 Free.
- 8432.39.00.10 Planters and transplanters (under: Other) (No.).
- 8432.39.00.90 Seeders (under: Other) (No.).
- 8432.41.00.00 Manure spreaders (under: Manure spreaders and fertilizer distributors) (No.): General Free; Special none; Column 2 Free.
- 8432.42.00.00 Fertilizer distributors (under: Manure spreaders and fertilizer distributors) (No.): General Free; Special none; Column 2 Free.
- 8432.80.00 Other machinery (under: Agricultural, horticultural or forestry machinery for soil preparation or cultivation; lawn or sports ground rollers; parts thereof): General Free; Special none; Column 2 Free.
- 8432.80.00.10 Tow behind spreaders, aerators, and de- thatchers (No.).
- 8432.80.00.80 Other (under: Other machinery) (No.).
- 8432.90.00 Parts (under: Agricultural, horticultural or forestry machinery for soil preparation or cultivation; lawn or sports ground rollers; parts thereof): General Free; Special none; Column 2 Free.
- 8432.90.00.10 Road wheels without tires (under: Parts) (No.).
- 8432.90.00.20 Wheel and tire assemblies (under: Parts) (No.).
- 8432.90.00.40 Of plows (under: Other) (No.).
- 8432.90.00.50 Of harrows, scarifiers, cultivators, weeders and hoes (No.).
- 8432.90.00.60 Of seeders, planters, transplanters, manure spreaders and fertilizer distributors (No.).
- 8432.90.00.81 Of other machinery (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.