HTS Heading 8439
Machinery for making pulp of fibrous cellulosic material or for making or finishing paper or paperboard (other than the machinery of heading 8419); parts thereof
All 9 HTS codes under heading 8439 (machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8439
- 8439 Machinery for making pulp of fibrous cellulosic material or for making or finishing paper or paperboard (other than the machinery of heading 8419); parts thereof.
- 8439.10.00 Machinery for making pulp of fibrous cellulosic material: General Free; Special none; Column 2 35%.
- 8439.10.00.10 New (under: Machinery for making pulp of fibrous cellulosic material) (No.).
- 8439.10.00.90 Used or rebuilt (under: Machinery for making pulp of fibrous cellulosic material) (No.).
- 8439.20.00 Machinery for making paper or paperboard: General Free; Special none; Column 2 35%.
- 8439.20.00.10 New (under: Machinery for making paper or paperboard) (No.).
- 8439.20.00.90 Used or rebuilt (under: Machinery for making paper or paperboard) (No.).
- 8439.30.00.00 Machinery for finishing paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8439.91 Of machinery for making pulp of fibrous cellulosic materials.
- 8439.91.10.00 Bed plates, roll bars and other stock-treating parts (No.): General Free; Special none; Column 2 20%.
- 8439.91.90.00 Other (under: Of machinery for making pulp of fibrous cellulosic materials) (No.): General Free; Special none; Column 2 35%.
- 8439.99 Other (under: Parts).
- 8439.99.10.00 Of machinery for making paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8439.99.50.00 Of machinery for finishing paper or paperboard (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.