HTS Heading 8440

Bookbinding machinery, including book-sewing machines, and parts thereof

All 2 HTS codes under heading 8440 (bookbinding machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8440

  • 8440 Bookbinding machinery, including book-sewing machines, and parts thereof.
  • 8440.10.00.00 Machinery (under: Bookbinding machinery, including book-sewing machines, and parts thereof) (No.): General Free; Special none; Column 2 25%.
  • 8440.90.00.00 Parts (under: Bookbinding machinery, including book-sewing machines, and parts thereof) (No.): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.