HTS Heading 8441
Other machinery for making up paper pulp, paper or paperboard, including cutting machines of all kinds, and parts thereof
All 6 HTS codes under heading 8441 (other machinery for making up paper pulp), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8441
- 8441 Other machinery for making up paper pulp, paper or paperboard, including cutting machines of all kinds, and parts thereof.
- 8441.10.00.00 Cutting machines (under: Other machinery for making up paper pulp, paper or paperboard, including cutting machines of all kinds, and parts thereof) (No.): General Free; Special none; Column 2 35%.
- 8441.20.00.00 Machines for making bags, sacks or envelopes (No.): General Free; Special none; Column 2 35%.
- 8441.30.00.00 Machines for making cartons, boxes, cases, tubes, drums or similar containers, other than by molding (No.): General Free; Special none; Column 2 35%.
- 8441.40.00.00 Machines for molding articles in paper pulp, paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8441.80.00.00 Other machinery (under: Other machinery for making up paper pulp, paper or paperboard, including cutting machines of all kinds, and parts thereof) (No.): General Free; Special none; Column 2 35%.
- 8441.90.00.00 Parts (under: Other machinery for making up paper pulp, paper or paperboard, including cutting machines of all kinds, and parts thereof) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.