HTS Heading 8442
Machinery, apparatus and equipment (other than the machines of headings 8456 to 8465), for preparing or making plates, cylinders or other printing components; plates, cylinders and other printing components; plates, cylinders and lithographic stones, prepared for printing purposes (for example, planed, grained or polished); parts thereof
All 5 HTS codes under heading 8442 (machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8442
- 8442 Machinery, apparatus and equipment (other than the machines of headings 8456 to 8465), for preparing or making plates, cylinders or other printing components; plates, cylinders and other printing components; plates, cylinders and lithographic stones, prepared for printing purposes (for example, planed, grained or polished); parts thereof.
- 8442.30.01 Machinery, apparatus and equipment: General Free; Special none; Column 2 Free.
- 8442.30.01.10 Phototypesetting and composing machines (No.).
- 8442.30.01.50 Other machinery, apparatus and equipment (No.).
- 8442.40.00.00 Parts of the foregoing machinery, apparatus or equipment (No.): General Free; Special none; Column 2 Free.
- 8442.50 Plates, cylinders and other printing components; plates, cylinders and lithographic stones, prepared for printing purposes (for example, planed, grained or polished).
- 8442.50.10.00 Plates (under: Plates, cylinders and other printing components; plates, cylinders and lithographic stones, prepared for printing purposes (for example, planed, grained or polished)) (No.): General Free; Special none; Column 2 25%.
- 8442.50.90.00 Other (under: Plates, cylinders and other printing components; plates, cylinders and lithographic stones, prepared for printing purposes (for example, planed, grained or polished)) (No.): General Free; Special none; Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.