HTS Heading 8443

Printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442; other printers, copying machines and facsimile machines, whether or not combined; parts and accessories thereof

All 43 HTS codes under heading 8443 (printing machinery used), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.3%.

Every line of heading 8443

  • 8443 Printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442; other printers, copying machines and facsimile machines, whether or not combined; parts and accessories thereof.
  • 8443.11 Offset printing machinery, reel-fed.
  • 8443.11.10.00 Double-width newspaper printing presses (No.): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8443.11.50.00 Other (under: Offset printing machinery, reel-fed) (No.): General Free; Special none; Column 2 25%.
  • 8443.12.00.00 Offset printing machinery, sheet-fed, office type (using sheets with one side not exceeding 22 cm and the other side not exceeding 36 cm in the unfolded state) (No.): General Free; Special none; Column 2 25%.
  • 8443.13.00.00 Other offset printing machinery (No.): General Free; Special none; Column 2 25%.
  • 8443.14.00.00 Letterpress printing machinery, reel fed, excluding flexographic printing (No.): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8443.15.00.00 Letterpress printing machinery, other than reel fed, excluding flexographic printing (No.): General Free; Special none; Column 2 25%.
  • 8443.16.00.00 Flexographic printing machinery (No.): General 2.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8443.17.00.00 Gravure printing machinery (under: Printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442) (No.): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8443.19 Other (under: Printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442).
  • 8443.19.20.00 Textile printing machinery (under: Other) (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8443.19.30.00 Other (under: Other) (No.): General Free; Special none; Column 2 25%.
  • 8443.31.00.00 Machines which perform two or more of the functions of printing, copying or facsimile transmission, capable of connecting to an automatic data processing machine or to a network (No.): General Free; Special none; Column 2 35%.
  • 8443.32 Other, capable of connecting to an automatic data processing machine or to a network.
  • 8443.32.10 Printer units (under: Other, capable of connecting to an automatic data processing machine or to a network): General Free; Special none; Column 2 35%.
  • 8443.32.10.10 Capable of producing more than 20 pages per minute (No.).
  • 8443.32.10.20 Other (under: Laser) (No.).
  • 8443.32.10.30 Light bar electronic type (under: Printer units) (No.).
  • 8443.32.10.40 Ink jet (under: Printer units) (No.).
  • 8443.32.10.50 Thermal transfer (under: Printer units) (No.).
  • 8443.32.10.60 Ionographic (under: Printer units) (No.).
  • 8443.32.10.70 Daisy wheel (under: Printer units) (No.).
  • 8443.32.10.80 Dot matrix (under: Printer units) (No.).
  • 8443.32.10.90 Other (under: Printer units) (No.).
  • 8443.32.50.00 Other (under: Other, capable of connecting to an automatic data processing machine or to a network) (No.): General Free; Special none; Column 2 35%.
  • 8443.39 Other (under: Other printers, copying machines and facsimile machines, whether or not combined).
  • 8443.39.10.00 Operating by reproducing the original image directly onto the copy (direct process) (No.): General Free; Special none; Column 2 35%.
  • 8443.39.20.00 Operating by reproducing the original image via an intermediate onto the copy (indirect process) (No.): General Free; Special none; Column 2 35%.
  • 8443.39.30.00 Incorporating an optical system (No.): General Free; Special none; Column 2 35%.
  • 8443.39.40.00 Of the contact type (under: Other photocopying apparatus) (No.): General Free; Special none; Column 2 35%.
  • 8443.39.50.00 Thermocopying apparatus (under: Copying machines) (No.): General Free; Special none; Column 2 35%.
  • 8443.39.60.00 Other (under: Copying machines) (No.): General Free; Special none; Column 2 35%.
  • 8443.39.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 8443.91 Parts and accessories of printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442.
  • 8443.91.10.00 Machines for uses ancillary to printing (No.): General Free; Special none; Column 2 25%.
  • 8443.91.20.00 Parts for textile printing machinery (No.): General Free; Special none; Column 2 40%.
  • 8443.91.30.00 Other (under: Parts and accessories of printing machinery used for printing by means of plates, cylinders and other printing components of heading 8442) (No.): General Free; Special none; Column 2 25%.
  • 8443.99 Other (under: Parts and accessories).
  • 8443.99.10.00 Accessory and auxiliary machines which are intended for attachment to an electrostatic photocopier and which do not operate independently of such photocopier (No.): General Free; Special none; Column 2 35%.
  • 8443.99.20 Parts of printer units of subheading 8443.32.10 specified in additional U.S. note 2 to this chapter: General Free; Special none; Column 2 35%.
  • 8443.99.20.10 Ink cartridges (under: Parts of printer units of subheading 8443.32.10 specified in additional U.S. note 2 to this chapter) (No.).
  • 8443.99.20.50 Other (under: Parts of printer units of subheading 8443.32.10 specified in additional U.S. note 2 to this chapter) (No.).
  • 8443.99.25 Other (under: Parts and accessories of printers): General Free; Special none; Column 2 35%.
  • 8443.99.25.10 Ink cartridges (under: Other) (No.).
  • 8443.99.25.50 Other (under: Other) (No.).
  • 8443.99.30.00 Parts of facsimile machines specified in additional U.S. note 3 to this chapter (No.): General Free; Special none; Column 2 35%.
  • 8443.99.35.00 Other (under: Parts and accessories of facsimile machines) (No.): General Free; Special none; Column 2 35%.
  • 8443.99.40.00 Parts of photocopying apparatus of subheading 8443.39.20 specified in additional U.S. note 4 to this chapter (No.): General Free; Special none; Column 2 35%.
  • 8443.99.45.00 Other (under: Parts and accessories of copying machines) (No.): General Free; Special none; Column 2 35%.
  • 8443.99.50 Other (under: Other): General Free; Special none; Column 2 35%.
  • 8443.99.50.11 Ink cartridges (under: For the goods of subheading 8443.31) (No.).
  • 8443.99.50.15 Other (under: For the goods of subheading 8443.31) (No.).
  • 8443.99.50.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.