HTS Heading 8444
Machines for extruding, drawing, texturing or cutting man-made textile materials
All 2 HTS codes under heading 8444 (machines for extruding, drawing), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8444
- 8444.00.00 Machines for extruding, drawing, texturing or cutting man-made textile materials: General Free; Special none; Column 2 40%.
- 8444.00.00.10 Texturing machines (under: Machines for extruding, drawing, texturing or cutting man-made textile materials) (No.).
- 8444.00.00.90 Other (under: Machines for extruding, drawing, texturing or cutting man-made textile materials) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.