HTS Heading 8445
Machines for preparing textile fibers; spinning, doubling or twisting machines and other machinery for producing textile yarns; textile reeling or winding (including weft winding) machines and machines for preparing textile yarns for use on the machines of heading 8446 or 8447
All 10 HTS codes under heading 8445 (machines for preparing textile fibers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 8445
- 8445 Machines for preparing textile fibers; spinning, doubling or twisting machines and other machinery for producing textile yarns; textile reeling or winding (including weft winding) machines and machines for preparing textile yarns for use on the machines of heading 8446 or 8447.
- 8445.11.00.00 Carding machines (under: Machines for preparing textile fibers) (No.): General Free; Special none; Column 2 40%.
- 8445.12.00.00 Combing machines (under: Machines for preparing textile fibers) (No.): General Free; Special none; Column 2 40%.
- 8445.13.00.00 Drawing or roving machines (under: Machines for preparing textile fibers) (No.): General Free; Special none; Column 2 40%.
- 8445.19.00 Other (under: Machines for preparing textile fibers): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8445.19.00.40 Cotton gins (under: Other) (No.).
- 8445.19.00.80 Other (under: Other) (No.).
- 8445.20.00.00 Textile spinning machines (under: Machines for preparing textile fibers; spinning, doubling or twisting machines and other machinery for producing textile yarns; textile reeling or winding (including weft winding) machines and machines for preparing textile yarns for use on the machines of heading 8446 or 8447) (No.): General Free; Special none; Column 2 40%.
- 8445.30.00 Textile doubling or twisting machines: General Free; Special none; Column 2 40%.
- 8445.30.00.10 Textile twisting machines (under: Textile doubling or twisting machines) (No.).
- 8445.30.00.90 Other (under: Textile doubling or twisting machines) (No.).
- 8445.40.00.00 Textile winding (including weft winding) or reeling machines (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8445.90.00.00 Other (under: Machines for preparing textile fibers; spinning, doubling or twisting machines and other machinery for producing textile yarns; textile reeling or winding (including weft winding) machines and machines for preparing textile yarns for use on the machines of heading 8446 or 8447) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.