HTS Heading 8446

Weaving machines (looms)

All 11 HTS codes under heading 8446 (weaving machines (looms)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 8446

  • 8446 Weaving machines (looms).
  • 8446.10.00 For weaving fabrics of a width not exceeding 30 cm: General Free; Special none; Column 2 40%.
  • 8446.10.00.10 Power looms (under: For weaving fabrics of a width not exceeding 30 cm) (No.).
  • 8446.10.00.90 Other (under: For weaving fabrics of a width not exceeding 30 cm) (No.).
  • 8446.21 Power looms (under: For weaving fabrics of a width exceeding 30 cm, shuttle type).
  • 8446.21.10.00 For weaving fabrics of a width exceeding 4.9 m (No.): General Free; Special none; Column 2 40%.
  • 8446.21.50.00 Other (under: Power looms) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8446.29.00.00 Other (under: For weaving fabrics of a width exceeding 30 cm, shuttle type) (No.): General Free; Special none; Column 2 40%.
  • 8446.30 For weaving fabrics of a width exceeding 30 cm, shuttleless type.
  • 8446.30.10 Power looms for weaving fabrics of a width exceeding 4.9 m: General Free; Special none; Column 2 40%.
  • 8446.30.10.10 Rapier type (under: Power looms for weaving fabrics of a width exceeding 4.9 m) (No.).
  • 8446.30.10.20 Jet type (under: Power looms for weaving fabrics of a width exceeding 4.9 m) (No.).
  • 8446.30.10.30 Other (under: Power looms for weaving fabrics of a width exceeding 4.9 m) (No.).
  • 8446.30.50 Other (under: For weaving fabrics of a width exceeding 30 cm, shuttleless type): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8446.30.50.10 Rapier type (under: Other) (No.).
  • 8446.30.50.20 Jet type (under: Other) (No.).
  • 8446.30.50.30 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.