HTS Heading 8463

Other machine tools for working metal or cermets, without removing material

All 12 HTS codes under heading 8463 (other machine tools for working metal or cermets), with their duty rates from the 2026 HTS Revision 23. General duty 4.4%.

Every line of heading 8463

  • 8463 Other machine tools for working metal or cermets, without removing material.
  • 8463.10.00 Drawbenches for bars, tubes, profiles, wire or the like: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8463.10.00.40 Used or rebuilt (under: Drawbenches for bars, tubes, profiles, wire or the like) (No.).
  • 8463.10.00.60 Other, valued under $3,025 each (No.).
  • 8463.10.00.80 Other (under: Drawbenches for bars, tubes, profiles, wire or the like) (No.).
  • 8463.20.00 Thread rolling machines (under: Other machine tools for working metal or cermets, without removing material): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8463.20.00.40 Used or rebuilt (under: Thread rolling machines) (No.).
  • 8463.20.00.60 Other, valued under $3,025 each (No.).
  • 8463.20.00.80 Other (under: Thread rolling machines) (No.).
  • 8463.30.00 Machines for working wire (under: Other machine tools for working metal or cermets, without removing material): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8463.30.00.40 Used or rebuilt (under: Machines for working wire) (No.).
  • 8463.30.00.60 Other, valued under $3,025 each (No.).
  • 8463.30.00.80 Other (under: Machines for working wire) (No.).
  • 8463.90.00 Other (under: Other machine tools for working metal or cermets, without removing material): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8463.90.00.40 Used or rebuilt (under: Other) (No.).
  • 8463.90.00.60 Other, valued under $3,025 each (No.).
  • 8463.90.00.80 Other (under: Other) (No.).

From MFG Calcs data: Metal-forming machine tools

U.S. imports of metal-forming machine tools (headings 8462, 8463) came to $1.75B in 2025, with $187M in calculated duty: an effective duty of 10.7%, every duty included.

Effective duty in Sep 2026: 10.6%, against 16.1% in Sep 2025.

Largest sources in 2025: Germany $331M at 9.5% effective duty; Italy $311M at 10.8% effective duty; Japan $179M at 5.9% effective duty; South Korea $138M at 5.0% effective duty; Austria $109M at 10.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.