Tariff monitor · Machinery & Equipment

Powered Hand Tools: Statutory & Effective Tariff Rates

USITC Column 1 General rates for 13 powered hand tools HTS lines (parseable range 0%–4.5%). Effective rate Aug 2026: 12.76%; monthly history since 2014.

The short answer

  • The observed effective calculated-duty rate on U.S. imports of powered hand tools was 12.76% in Aug 2026, down from 20.78% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–4.5% across 13 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. China is the largest source, holding 29.2% of 2025 imports.

Statutory rates from the schedule

  • Pneumatic, hydraulic, and electric hand tools — drills, grinders, impact wrenches, and nutrunners on the assembly line. This family covers HTS heading 8467: 13 eight-digit rate lines with a parseable Column 1 General range of 0%–4.5% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
  • Chapter 99 references on individual lines (for example, 9903.90.08) identify provisions to review; applicability and any additional duty depend on the entry facts.

Observed calculated-duty data

  • Latest month on record (2026-08): 12.76% effective on $506.6M of imports, versus 20.78% in the same month a year earlier. The monthly archive holds 152 observations from 2014-01 through 2026-08.
  • In 2025, U.S. imports for consumption in this family totaled $6.6B in customs value, with $910.4M in USITC reported calculated duty on $6.6B of covered customs value: an effective calculated-duty rate of 13.76%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
  • A year earlier the effective calculated-duty rate was 2.15%, so the observed rate rose 11.6 points.
  • Top source countries in 2025: China ($1.9B at 21.66%), Vietnam ($1.6B at 9.38%), Mexico ($1.4B at 11.64%), Germany ($467.4M at 10.69%), Taiwan ($329.8M at 9.73%).
  • Reported freight and insurance equaled 1.83% of covered customs value in 2025 ($120.9M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
  • Customs unit value: 27.3303 per unit in 2025, aggregate declared customs value divided by reported quantity across eligible single-unit lines (USITC DataWeb); not a transaction price.
  • For scale, 2025 imports in this family equal 4.1% of the U.S. wood products industry's $161B gross output (2025, BEA).

Representative rate lines

  • 8467.11.10: Suitable for metal working · MFN 4.5%
  • 8467.11.50: Other · MFN Free
  • 8467.19.10.00: Suitable for metal working · MFN 4.5%
  • 8467.19.50: Other · MFN Free
  • 8467.21.00: Drills of all kinds · MFN 1.7%
  • 8467.22.00: Saws · MFN Free
  • 8467.29.00: Other · MFN Free
  • 8467.81.00.00: Chain saws · MFN Free

Frequently asked questions

  • What is the U.S. tariff rate on powered hand tools? USITC calculated duties imply an effective rate of 12.76% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–4.5%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
  • What are the statutory MFN line rates for powered hand tools? The parseable Column 1 General line-rate range is 0%–4.5% across the family's 13 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8467). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
  • Which countries supply the most powered hand tools to the U.S.? Top retained sources in 2025: China ($1.9B at 21.66%), Vietnam ($1.6B at 9.38%), Mexico ($1.4B at 11.64%). China holds 29.2% of total family import customs value. Retained sources cover 94.9%; their HHI is 2000, a lower bound whose floor falls in the moderately concentrated range without classifying the omitted tail.
  • How much powered hand tools does the U.S. import? $6.6B of customs value in 2025, with $910.4M in USITC Calculated Duties — an effective calculated-duty rate of 13.76%.
  • Is the U.S. a net importer of powered hand tools? Yes — a net importer in 2025: $6.6B imported vs $827.2M exported (exports are 13% of imports).
  • What is the customs unit value of powered hand tools? $27.3/unit in 2025, derived as customs value ÷ reported quantity from USITC DataWeb. It is an aggregate across the family's product and origin mix, not a transaction price or supplier quote.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-08.