HTS Heading 8518
Microphones and stands therefor; loudspeakers, whether or not mounted in their enclosures; headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers; audio-frequency electric amplifiers; electric sound amplifier sets; parts thereof
All 16 HTS codes under heading 8518 (microphones and stands therefor), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8518
- 8518 Microphones and stands therefor; loudspeakers, whether or not mounted in their enclosures; headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers; audio-frequency electric amplifiers; electric sound amplifier sets; parts thereof.
- 8518.10 Microphones and stands therefor.
- 8518.10.40.00 Microphones having a frequency range of 300 Hz to 3.4 kHz with a diameter of not exceeding 10 mm and a height not exceeding 3 mm, for telecommunication use (No.): General Free; Special none; Column 2 35%.
- 8518.10.80 Other (under: Microphones and stands therefor): General Free; Special none; Column 2 35%.
- 8518.10.80.30 Microphones (under: Other) (No.).
- 8518.10.80.40 Other (under: Other) (No.).
- 8518.21.00.00 Single loudspeakers, mounted in their enclosures (No.): General Free; Special none; Column 2 35%.
- 8518.22.00.00 Multiple loudspeakers, mounted in the same enclosure (No.): General Free; Special none; Column 2 35%.
- 8518.29 Other (under: Loudspeakers, whether or not mounted in their enclosures).
- 8518.29.40.00 Without housing, having a frequency range of 300 Hz to 3.4 kHz with a diameter of not exceeding 50 mm, for telecommunication use (No.): General Free; Special none; Column 2 35%.
- 8518.29.80.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8518.30 Headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers.
- 8518.30.10.00 Line telephone handsets (under: Headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers) (No.): General Free; Special none; Column 2 35%.
- 8518.30.20.00 Other (under: Headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers) (No.): General Free; Special none; Column 2 35%.
- 8518.40 Audio-frequency electric amplifiers.
- 8518.40.10.00 For use as repeaters in line telephony (No.): General Free; Special none; Column 2 35%.
- 8518.40.20.00 Other (under: Audio-frequency electric amplifiers) (No.): General Free; Special none; Column 2 35%.
- 8518.50.00.00 Electric sound amplifier sets (No.): General Free; Special none; Column 2 35%.
- 8518.90 Parts (under: Microphones and stands therefor; loudspeakers, whether or not mounted in their enclosures; headphones and earphones, whether or not combined with a microphone, and sets consisting of a microphone and one or more loudspeakers; audio-frequency electric amplifiers; electric sound amplifier sets; parts thereof).
- 8518.90.20.00 Printed circuit assemblies of line telephone handsets; parts of repeaters (No.): General Free; Special none; Column 2 35%.
- 8518.90.41.00 Other (under: Of line telephone handsets of subheading 8518.30.10; of repeaters of subheading 8518.40.10) (No.): General Free; Special none; Column 2 35%.
- 8518.90.60.00 Printed circuit assemblies of the articles of subheading 8518.10.40 or 8518.29.40 (No.): General Free; Special none; Column 2 35%.
- 8518.90.81.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.