HTS Heading 8519
Sound recording or reproducing apparatus
All 15 HTS codes under heading 8519 (sound recording or reproducing apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 8519
- 8519 Sound recording or reproducing apparatus.
- 8519.20.00.00 Apparatus operated by coins, banknotes, bank cards, tokens or by other means of payment (No.): General Free; Special none; Column 2 35%.
- 8519.30 Turntables (record-decks) (under: Sound recording or reproducing apparatus).
- 8519.30.10.00 With automatic record changing mechanism (No.): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8519.30.20.00 Other (under: Turntables (record-decks)) (No.): General Free; Special none; Column 2 35%.
- 8519.81 Using magnetic, optical or semiconductor media.
- 8519.81.10.00 Transcribing machines (under: Sound reproducing only) (No.): General Free; Special none; Column 2 35%.
- 8519.81.20.00 Designed exclusively for motor- vehicle installation (No.): General Free; Special none; Column 2 35%.
- 8519.81.25.00 Other (under: Cassette-type tape players) (No.): General Free; Special none; Column 2 35%.
- 8519.81.30 Other (under: Sound reproducing only): General Free; Special none; Column 2 35%.
- 8519.81.30.10 Optical disc (including compact disc) players (No.).
- 8519.81.30.20 Other (under: Other) (No.).
- 8519.81.41 Other (under: Using magnetic, optical or semiconductor media): General Free; Special none; Column 2 35%.
- 8519.81.41.05 Telephone answering machines (under: Other) (No.).
- 8519.81.41.10 Magnetic tape recorders incorporating sound reproducing apparatus (No.).
- 8519.81.41.20 Optical disc recorders (under: Other) (No.).
- 8519.81.41.50 Other (under: Other) (No.).
- 8519.89 Other (under: Other apparatus).
- 8519.89.10.00 Without loudspeaker (under: Record players, other than those operated by coins, banknotes, bank cards, tokens or by other means of payment) (No.): General Free; Special none; Column 2 35%.
- 8519.89.20.00 Other (under: Record players, other than those operated by coins, banknotes, bank cards, tokens or by other means of payment) (No.): General Free; Special none; Column 2 35%.
- 8519.89.30.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.