HTS Heading 8526
Radar apparatus, radio navigational aid apparatus and radio remote control apparatus
All 6 HTS codes under heading 8526 (radar apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8526
- 8526 Radar apparatus, radio navigational aid apparatus and radio remote control apparatus.
- 8526.10.00 Radar apparatus (under: Radar apparatus, radio navigational aid apparatus and radio remote control apparatus): General Free; Special none; Column 2 35%.
- 8526.10.00.20 Designed for boat or ship installation (No.).
- 8526.10.00.40 Other (under: Radar apparatus) (No.).
- 8526.91.00 Radio navigational aid apparatus: General Free; Special none; Column 2 35%.
- 8526.91.00.20 Reception only apparatus (under: Radio navigational aid apparatus) (No.).
- 8526.91.00.40 Other (under: Radio navigational aid apparatus) (No.).
- 8526.92 Radio remote control apparatus.
- 8526.92.10.00 Radio remote control apparatus for video game consoles (No.): General Free; Special none; Column 2 35%.
- 8526.92.50.00 Other (under: Radio remote control apparatus) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.