HTS Heading 8527
Reception apparatus for radiobroadcasting, whether or not combined, in the same housing, with sound recording or reproducing apparatus or a clock
All 27 HTS codes under heading 8527 (reception apparatus for radiobroadcasting), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2%.
Every line of heading 8527
- 8527 Reception apparatus for radiobroadcasting, whether or not combined, in the same housing, with sound recording or reproducing apparatus or a clock.
- 8527.12.00.00 Pocket-size radio cassette players (No.): General Free; Special none; Column 2 35%.
- 8527.13 Other apparatus combined with sound recording or reproducing apparatus.
- 8527.13.11.00 Combinations incorporating tape players which are incapable of recording (No.): General Free; Special none; Column 2 35%.
- 8527.13.20 Radio-tape recorder combinations: General Free; Special none; Column 2 35%.
- 8527.13.20.15 Cassette type (under: Radio-tape recorder combinations) (No.).
- 8527.13.20.25 Other (under: Radio-tape recorder combinations) (No.).
- 8527.13.40.00 Radio-phonograph combinations (No.): General Free; Special none; Column 2 35%.
- 8527.13.60 Other (under: Other): General Free; Special none; Column 2 35%.
- 8527.13.60.40 Incorporating optical disc (including compact disc) players or recorders (No.).
- 8527.13.60.80 Other (under: Other) (No.).
- 8527.19 Other (under: Radiobroadcast receivers capable of operating without an external source of power).
- 8527.19.10.00 Valued not over $40 each, incorporating a clock or clock-timer, not in combination with any other article, and not designed for motor vehicle installation (No.): General Free; Special none; Column 2 35%.
- 8527.19.50 Other (under: Other): General Free; Special none; Column 2 35%.
- 8527.19.50.10 FM only or AM/FM only (under: Other) (No.).
- 8527.19.50.25 Other (under: Other) (No.).
- 8527.21 Combined with sound recording or reproducing apparatus.
- 8527.21.15.00 Combined with sound recording or reproducing apparatus capable of receiving and decoding digital radio data system signals (No.): General Free; Special none; Column 2 35%.
- 8527.21.25 Other (under: Radio-tape player combinations): General 2%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8527.21.25.10 Incorporating optical disc (including compact disc) players or recorders (No.).
- 8527.21.25.25 Other (under: Other) (No.).
- 8527.21.40 Other (under: Combined with sound recording or reproducing apparatus): General Free; Special none; Column 2 35%.
- 8527.21.40.40 Incorporating optical disc (including compact disc) players or recorders (No.).
- 8527.21.40.80 Other (under: Other) (No.).
- 8527.29 Other (under: Radiobroadcast receivers not capable of operating without an external source of power, of a kind used in motor vehicles).
- 8527.29.40.00 FM only or AM/FM only (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8527.29.80.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8527.91 Combined with sound recording or reproducing apparatus.
- 8527.91.05.00 Articles designed for connection to telegraphic or telephonic apparatus or instruments or to telegraphic or telephonic networks (No.): General Free; Special none; Column 2 35%.
- 8527.91.40.00 Combinations incorporating tape players which are incapable of recording (No.): General Free; Special none; Column 2 35%.
- 8527.91.50.00 Other combinations incorporating tape recorders (No.): General Free; Special none; Column 2 35%.
- 8527.91.60 Other (under: Other): General Free; Special none; Column 2 35%.
- 8527.91.60.40 Incorporating optical disc (including compact disc) players or recorders (No.).
- 8527.91.60.80 Other (under: Other) (No.).
- 8527.92 Not combined with sound recording or reproducing apparatus but combined with a clock.
- 8527.92.10.00 Valued not over $40 each (under: Not combined with sound recording or reproducing apparatus but combined with a clock) (No.): General Free; Special none; Column 2 35%.
- 8527.92.50.00 Other (under: Not combined with sound recording or reproducing apparatus but combined with a clock) (No.): General Free; Special none; Column 2 35%.
- 8527.99 Other (under: Other).
- 8527.99.10.00 Infant nursery monitor systems, each consisting in the same package of a radio transmitter, an electrical adapter, and a radio receiver (No.): General Free; Special none; Column 2 35%.
- 8527.99.15.00 Other radio receivers (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8527.99.40.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.