HTS Heading 8603
Self-propelled railway or tramway coaches, vans and trucks, other than those of heading 8604
All 2 HTS codes under heading 8603 (self-propelled railway), with their duty rates from the 2026 HTS Revision 23. General duty 5%.
Every line of heading 8603
- 8603 Self-propelled railway or tramway coaches, vans and trucks, other than those of heading 8604.
- 8603.10.00.00 Powered from an external source of electricity (No.): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8603.90.00.00 Other (under: Self-propelled railway or tramway coaches, vans and trucks, other than those of heading 8604) (No.): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.