HTS Chapter 86

Railway or tramway locomotives, rolling stock and track fixtures; traffic signaling equipment

The 9 headings and 37 HTS codes of chapter 86 (railway equipment), with their duty rates from the 2026 HTS Revision 23.

The 9 headings of chapter 86

Where it sits in the schedule

Chapter 86 is in Section XVII of the Harmonized System, vehicles, aircraft and vessels (chapters 86 to 89). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.