HTS Heading 8602

Other rail locomotives; locomotive tenders

All 2 HTS codes under heading 8602 (other rail locomotives), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8602

  • 8602 Other rail locomotives; locomotive tenders.
  • 8602.10.00.00 Diesel-electric locomotives (under: Other rail locomotives; locomotive tenders) (No.): General Free; Special none; Column 2 35%.
  • 8602.90.00.00 Other (under: Other rail locomotives; locomotive tenders) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.