HTS Heading 8605

Railway or tramway passenger coaches, not self- propelled; luggage vans, post office coaches and other special purpose railway or tramway coaches, not self- propelled (excluding those of heading 8604)

The HTS code under heading 8605 (railway or tramway passenger coaches), with its duty rates from the 2026 HTS Revision 23. General duty 14%.

Every line of heading 8605

  • 8605.00.00.00 Railway or tramway passenger coaches, not self- propelled; luggage vans, post office coaches and other special purpose railway or tramway coaches, not self- propelled (excluding those of heading 8604) (No.): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.