HTS Heading 8606

Railway or tramway freight cars, not self-propelled

All 6 HTS codes under heading 8606 (railway or tramway freight cars, not self-propelled), with their duty rates from the 2026 HTS Revision 23. General duty 14%.

Every line of heading 8606

  • 8606 Railway or tramway freight cars, not self-propelled.
  • 8606.10.00.00 Tank cars and the like (under: Railway or tramway freight cars, not self-propelled) (No.): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8606.30.00.00 Self-discharging cars, other than those of subheading 8606.10 (No.): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8606.91.00.00 Covered and closed (under: Other) (No.): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8606.92.00.00 Open, with non-removable sides of a height exceeding 60 cm (No.): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8606.99.01 Other (under: Other): General 14%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8606.99.01.30 Flatcars having a flat floor or deck laid on the underframe, with no roof and with no raised sides or ends (No.).
  • 8606.99.01.60 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.