HTS Heading 8608

Railway or tramway track fixtures and fittings; mechanical (including electro-mechanical) signaling, safety or traffic control equipment for railways, tramways, roads, inland waterways, parking facilities, port installations or airfields; parts of the foregoing

The HTS code under heading 8608 (railway or tramway track fixtures and fittings), with its duty rates from the 2026 HTS Revision 23. General duty 3.8%.

Every line of heading 8608

  • 8608.00.00.00 Railway or tramway track fixtures and fittings; mechanical (including electro-mechanical) signaling, safety or traffic control equipment for railways, tramways, roads, inland waterways, parking facilities, port installations or airfields; parts of the foregoing (kg): General 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.