HTS Heading 8607
Parts of railway or tramway locomotives or rolling stock
All 21 HTS codes under heading 8607 (parts of railway), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 8607
- 8607 Parts of railway or tramway locomotives or rolling stock.
- 8607.11.00.00 Truck assemblies for self-propelled vehicles (No.): General Free; Special none; Column 2 35%.
- 8607.12.00.00 Other truck assemblies (under: Truck assemblies, axles and wheels, and parts thereof) (No.): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.19 Other, including parts (under: Truck assemblies, axles and wheels, and parts thereof).
- 8607.19.03.00 Axles (under: Axles and parts thereof) (kg): General 0.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 3%.
- 8607.19.06.00 Parts of axles (under: Axles and parts thereof) (kg): General 0.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 3%.
- 8607.19.12.00 Wheels, whether or not fitted with axles (kg): General Free; Special none; Column 2 2.2¢/kg.
- 8607.19.15.00 Parts of wheels (under: Wheels and parts thereof, and any of such wheels or parts imported with axles fitted in them) (kg): General Free; Special none; Column 2 2.2¢/kg.
- 8607.19.30 Parts of truck assemblies of vehicles of heading 8605 or 8606: General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.19.30.10 Bolsters (under: Parts of truck assemblies of vehicles of heading 8605 or 8606) (kg).
- 8607.19.30.20 Side frames (under: Parts of truck assemblies of vehicles of heading 8605 or 8606) (kg).
- 8607.19.30.90 Other (under: Parts of truck assemblies of vehicles of heading 8605 or 8606) (kg).
- 8607.19.90.00 Other (under: Other, including parts) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8607.21 Air brakes and parts thereof (under: Brakes and parts thereof).
- 8607.21.10.00 For vehicles of heading 8605 or 8606 (kg): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.21.50.00 Other (under: Air brakes and parts thereof) (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8607.29 Other (under: Brakes and parts thereof).
- 8607.29.10.00 For vehicles of heading 8605 or 8606 (kg): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.29.50.00 Other (under: Other) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8607.30 Hooks and other coupling devices, buffers, and parts thereof.
- 8607.30.10 For vehicles of heading 8605 or 8606: General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.30.10.10 Assembled freight rail couplers (kg).
- 8607.30.10.50 Freight rail coupler parts (under: For vehicles of heading 8605 or 8606) (kg).
- 8607.30.10.90 Other (under: For vehicles of heading 8605 or 8606) (kg).
- 8607.30.50.00 Other (under: Hooks and other coupling devices, buffers, and parts thereof) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8607.91.00.00 Of locomotives (under: Other) (kg): General Free; Special none; Column 2 35%.
- 8607.99 Other (under: Other).
- 8607.99.10.00 For vehicles of heading 8605 or 8606, except brake regulators (kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8607.99.50.00 Other (under: Other) (kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.