HTS Heading 8701

Tractors (other than tractors of heading 8709)

All 38 HTS codes under heading 8701 (tractors), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.

Every line of heading 8701

  • 8701 Tractors (other than tractors of heading 8709).
  • 8701.10.01.00 Single axle tractors (under: Tractors (other than tractors of heading 8709)) (No.): General Free; Special none; Column 2 Free.
  • 8701.21.00 With only compression-ignition internal combustion piston engine (diesel or semi-diesel): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8701.21.00.15 G.V.W. not exceeding 36,287 kg (No.).
  • 8701.21.00.45 G.V.W. exceeding 36,287 kg (under: New) (No.).
  • 8701.21.00.80 Used (under: With only compression-ignition internal combustion piston engine (diesel or semi-diesel)) (No.).
  • 8701.22.00 With both compression-ignition internal combustion piston engine (diesel or semi-diesel) and electric motor as motors for propulsion: General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8701.22.00.15 G.V.W. not exceeding 36,287 kg (No.).
  • 8701.22.00.45 G.V.W. exceeding 36,287 kg (under: New) (No.).
  • 8701.22.00.80 Used (under: With both compression-ignition internal combustion piston engine (diesel or semi-diesel) and electric motor as motors for propulsion) (No.).
  • 8701.23.00 With both spark-ignition internal combustion piston engine and electric motor as motors for propulsion: General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8701.23.00.15 G.V.W. not exceeding 36,287 kg (No.).
  • 8701.23.00.45 G.V.W. exceeding 36,287 kg (under: New) (No.).
  • 8701.23.00.80 Used (under: With both spark-ignition internal combustion piston engine and electric motor as motors for propulsion) (No.).
  • 8701.24.00 With only electric motor for propulsion: General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8701.24.00.15 G.V.W. not exceeding 36,287 kg (No.).
  • 8701.24.00.45 G.V.W. exceeding 36,287 kg (under: New) (No.).
  • 8701.24.00.80 Used (under: With only electric motor for propulsion) (No.).
  • 8701.29.00 Other (under: Road tractors for semi-trailers): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8701.29.00.15 G.V.W. not exceeding 36,287 kg (No.).
  • 8701.29.00.45 G.V.W. exceeding 36,287 kg (under: New) (No.).
  • 8701.29.00.80 Used (under: Other) (No.).
  • 8701.30 Track-laying tractors (under: Tractors (other than tractors of heading 8709)).
  • 8701.30.10 Suitable for agricultural use: General Free; Special none; Column 2 Free.
  • 8701.30.10.15 With a net engine power of less than 93.3 kW (No.).
  • 8701.30.10.30 With a net engine power of 93.3 kW or more but less than 119.4 kW (No.).
  • 8701.30.10.45 With a net engine power of 119.4 kW or more but less than 194 kW (No.).
  • 8701.30.10.60 With a net engine power of 194 kW or more but less than 257.4 kW (No.).
  • 8701.30.10.75 With a net engine power of 257.4 kW or more (No.).
  • 8701.30.10.90 Used (under: Suitable for agricultural use) (No.).
  • 8701.30.50 Other (under: Track-laying tractors): General Free; Special none; Column 2 27.5%.
  • 8701.30.50.15 With a net engine power of less than 93.3 kW (No.).
  • 8701.30.50.30 With a net engine power of 93.3 kW or more but less than 119.4 kW (No.).
  • 8701.30.50.45 With a net engine power of 119.4 kW or more but less than 194 kW (No.).
  • 8701.30.50.60 With a net engine power of 194 kW or more but less than 257.4 kW (No.).
  • 8701.30.50.75 With a net engine power of 257.4 kW or more (No.).
  • 8701.30.50.90 Used (under: Other) (No.).
  • 8701.91 Not exceeding 18 kW (under: Other, of an engine power).
  • 8701.91.10.00 For agricultural use (under: Not exceeding 18 kW) (No.): General Free; Special none; Column 2 Free.
  • 8701.91.50.00 Other (under: Not exceeding 18 kW) (No.): General Free; Special none; Column 2 27.5%.
  • 8701.92 Exceeding 18 kW but not exceeding 37 kW.
  • 8701.92.10.00 Suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8701.92.50.00 Other (under: Exceeding 18 kW but not exceeding 37 kW) (No.): General Free; Special none; Column 2 27.5%.
  • 8701.93 Exceeding 37 kW but not exceeding 75 kW.
  • 8701.93.10.00 Suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8701.93.50.00 Other (under: Exceeding 37 kW but not exceeding 75 kW) (No.): General Free; Special none; Column 2 27.5%.
  • 8701.94 Exceeding 75 kW but not exceeding 130 kW.
  • 8701.94.10.00 Suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8701.94.50.00 Other (under: Exceeding 75 kW but not exceeding 130 kW) (No.): General Free; Special none; Column 2 27.5%.
  • 8701.95 Exceeding 130 kW (under: Other, of an engine power).
  • 8701.95.10.00 Suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8701.95.50.00 Other (under: Exceeding 130 kW) (No.): General Free; Special none; Column 2 27.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.