HTS Chapter 87

Vehicles other than railway or tramway rolling stock, and parts and accessories thereof

The 16 headings and 402 HTS codes of chapter 87 (vehicles and parts), with their duty rates from the 2026 HTS Revision 23.

The 16 headings of chapter 87

Where it sits in the schedule

Chapter 87 is in Section XVII of the Harmonized System, vehicles, aircraft and vessels (chapters 86 to 89). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.