HTS Heading 8702
Motor vehicles for the transport of ten or more persons, including the driver
All 10 HTS codes under heading 8702 (motor vehicles), with their duty rates from the 2026 HTS Revision 23. General duty 2%.
Every line of heading 8702
- 8702 Motor vehicles for the transport of ten or more persons, including the driver.
- 8702.10 With only compression-ignition internal combustion piston engine (diesel or semi-diesel).
- 8702.10.31.00 Designed for the transport of 16 or more persons, including the driver (No.): General 2%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.10.61.00 Other (under: With only compression-ignition internal combustion piston engine (diesel or semi-diesel)) (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.20 With both compression-ignition internal combustion piston engine (diesel or semi-diesel) and electric motor as motors for propulsion.
- 8702.20.31.00 Designed for the transport of 16 or more persons, including the driver (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.20.61.00 Other (under: With both compression-ignition internal combustion piston engine (diesel or semi-diesel) and electric motor as motors for propulsion) (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.30 With both spark-ignition internal combustion piston engine and electric motor as motors for propulsion.
- 8702.30.31.00 Designed for the transport of 16 or more persons, including the driver (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.30.61.00 Other (under: With both spark-ignition internal combustion piston engine and electric motor as motors for propulsion) (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.40 With only electric motor for propulsion.
- 8702.40.31.00 Designed for the transport of 16 or more persons, including the driver (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.40.61.00 Other (under: With only electric motor for propulsion) (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.90 Other (under: Motor vehicles for the transport of ten or more persons, including the driver).
- 8702.90.31.00 Designed for the transport of 16 or more persons, including the driver (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8702.90.61.00 Other (under: Other) (No.): General 2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.