HTS Heading 8714

Parts and accessories of vehicles of headings 8711 to 8713

All 31 HTS codes under heading 8714 (parts and accessories of vehicles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10%.

Every line of heading 8714

  • 8714 Parts and accessories of vehicles of headings 8711 to 8713.
  • 8714.10.00 Of motorcycles (including mopeds): General Free; Special none; Column 2 25%.
  • 8714.10.00.10 Saddles and seats (under: Of motorcycles (including mopeds)) (kg).
  • 8714.10.00.20 Wheels (under: Of motorcycles (including mopeds)) (kg).
  • 8714.10.00.50 Other (under: Of motorcycles (including mopeds)) (kg).
  • 8714.20.00.00 Of carriages for disabled persons (kg): General Free; Special none; Column 2 40%.
  • 8714.91 Frames and forks, and parts thereof.
  • 8714.91.20.00 Valued over $600 each (under: Frames) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8714.91.30.00 Other (under: Frames) (No.): General 3.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8714.91.50.00 Sets of steel tubing cut to exact length and each set having the number of tubes needed for the assembly (with other parts) into the frame and fork of one bicycle (kg): General 6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG)3% (JP); Column 2 30%.
  • 8714.91.90.00 Other (under: Frames and forks, and parts thereof) (kg): General Free; Special none; Column 2 30%.
  • 8714.92 Wheel rims and spokes (under: Other).
  • 8714.92.10.00 Wheel rims (under: Wheel rims and spokes) (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8714.92.50.00 Spokes (under: Wheel rims and spokes) (kg): General 10%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5% (JP); Column 2 30%.
  • 8714.93 Hubs, other than coaster braking hubs and hub brakes, and free-wheel sprocket-wheels.
  • 8714.93.05.00 Aluminum alloy hubs with a hollow axle and lever-operated quick release mechanism (No.): General Free; Special none; Column 2 30%.
  • 8714.93.15.00 Three speed (under: Other) (No.): General Free; Special none; Column 2 30%.
  • 8714.93.24.00 Two speed (under: Variable speed (except three speed) with internal gear changing mechanisms) (No.): General Free; Special none; Column 2 30%.
  • 8714.93.28.00 Other (under: Variable speed (except three speed) with internal gear changing mechanisms) (No.): General 3%; Special Free (A+,AU,BH,CL, CO,D,E,IL,JO,JP,KR, MA,OM,P,PA, PE,S,SG); Column 2 30%.
  • 8714.93.35.00 Other (under: Other) (No.): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5% (JP); Column 2 30%.
  • 8714.93.70 Free-wheel sprocket-wheels (under: Hubs, other than coaster braking hubs and hub brakes, and free-wheel sprocket-wheels): General Free; Special none; Column 2 30%.
  • 8714.93.70.30 Multiple free-wheel sprockets (No.).
  • 8714.93.70.60 Other (under: Free-wheel sprocket-wheels) (kg).
  • 8714.94 Brakes, including coaster braking hubs and hub brakes, and parts thereof.
  • 8714.94.30 Drum brakes, caliper and cantilever bicycle brakes, and coaster brakes; parts thereof (including cable or inner wire therefor, fitted with fittings): General Free; Special none; Column 2 30%.
  • 8714.94.30.20 Caliper and cantilever bicycle brakes (No.).
  • 8714.94.30.40 Designed for single-speed bicycles (No.).
  • 8714.94.30.50 Designed for three-speed bicycles (No.).
  • 8714.94.30.60 Other (under: Other) (No.).
  • 8714.94.30.80 Other (under: Drum brakes, caliper and cantilever bicycle brakes, and coaster brakes; parts thereof (including cable or inner wire therefor, fitted with fittings)) (kg).
  • 8714.94.90.00 Other (under: Brakes, including coaster braking hubs and hub brakes, and parts thereof) (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5% (JP); Column 2 30%.
  • 8714.95.00.00 Saddles (under: Other) (No.): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 4% (JP); Column 2 30%.
  • 8714.96 Pedals and crank-gear, and parts thereof.
  • 8714.96.10.00 Pedals and parts thereof (under: Pedals and crank-gear, and parts thereof) (kg): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 4% (JP); Column 2 30%.
  • 8714.96.50.00 Cotterless-type crank sets and parts thereof (kg): General Free; Special none; Column 2 30%.
  • 8714.96.90.00 Other crank-gear and parts thereof (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5% (JP); Column 2 30%.
  • 8714.99 Other (under: Other).
  • 8714.99.10.00 Click twist grips and click stick levers (kg): General Free; Special none; Column 2 30%.
  • 8714.99.50.00 Derailleurs and parts thereof (kg): General Free; Special none; Column 2 30%.
  • 8714.99.60.00 Trigger and twist grip controls for three speed hubs, and parts thereof; bicycle handlebar stems wholly of aluminum alloy (including their hardware of any material), valued over $2.15 each; and bicycle handlebar stem rotor assemblies (kg): General Free; Special none; Column 2 30%.
  • 8714.99.80.00 Other (under: Other) (kg): General 10%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5% (JP); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.