HTS Heading 8713
Carriages for disabled persons, whether or not motorized or otherwise mechanically propelled
All 3 HTS codes under heading 8713 (carriages for disabled persons), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8713
- 8713 Carriages for disabled persons, whether or not motorized or otherwise mechanically propelled.
- 8713.10.00.00 Not mechanically propelled (under: Carriages for disabled persons, whether or not motorized or otherwise mechanically propelled) (No.): General Free; Special none; Column 2 40%.
- 8713.90.00 Other (under: Carriages for disabled persons, whether or not motorized or otherwise mechanically propelled): General Free; Special none; Column 2 10%.
- 8713.90.00.30 Three-wheeled (under: Other) (No.).
- 8713.90.00.60 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.