HTS Heading 8716
Trailers and semi-trailers; other vehicles, not mechanically propelled; and parts thereof
All 27 HTS codes under heading 8716 (trailers and semi-trailers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.
Every line of heading 8716
- 8716 Trailers and semi-trailers; other vehicles, not mechanically propelled; and parts thereof.
- 8716.10.00 Trailers and semi-trailers for housing or camping: General Free; Special none; Column 2 45%.
- 8716.10.00.30 Less than 10.6 m in length (under: Trailers and semi-trailers for housing or camping) (No.).
- 8716.10.00.75 10.6 m or more in length (under: Trailers and semi-trailers for housing or camping) (No.).
- 8716.20.00.00 Self-loading or self-unloading trailers and semi-trailers for agricultural purposes (No.): General Free; Special none; Column 2 45%.
- 8716.31.00.00 Tanker trailers and tanker semi-trailers (No.): General Free; Special none; Column 2 45%.
- 8716.39.00 Other (under: Other trailers and semi-trailers for the transport of goods): General Free; Special none; Column 2 45%.
- 8716.39.00.10 Agricultural (under: Other) (No.).
- 8716.39.00.20 For use with the vehicles of heading 8709 (No.).
- 8716.39.00.30 For use with the vehicles of heading 8703 (No.).
- 8716.39.00.40 Van type (under: Other) (No.).
- 8716.39.00.50 Platform type (under: Other) (No.).
- 8716.39.00.90 Other (under: Other) (No.).
- 8716.40.00.00 Other trailers and semi-trailers (No.): General Free; Special none; Column 2 45%.
- 8716.80 Other vehicles (under: Trailers and semi-trailers; other vehicles, not mechanically propelled; and parts thereof).
- 8716.80.10.00 Farm wagons and carts (under: Other vehicles) (No.): General Free; Special none; Column 2 Free.
- 8716.80.50 Other (under: Other vehicles): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8716.80.50.10 Industrial hand trucks (under: Other) (No.).
- 8716.80.50.20 Portable luggage carts (under: Other) (No.).
- 8716.80.50.90 Other (under: Other) (No.).
- 8716.90 Parts (under: Trailers and semi-trailers; other vehicles, not mechanically propelled; and parts thereof).
- 8716.90.10 Parts of farm wagons and carts: General Free; Special none; Column 2 Free.
- 8716.90.10.10 Road wheels (under: Parts of farm wagons and carts) (kg).
- 8716.90.10.20 Wheel and tire assemblies (under: Parts of farm wagons and carts) (kg).
- 8716.90.10.90 Other (under: Parts of farm wagons and carts) (kg).
- 8716.90.30.00 Castors, other than those of heading 8302 (kg): General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8716.90.50 Other (under: Parts): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8716.90.50.10 Axles and parts thereof (under: Other) (kg).
- 8716.90.50.35 Steel wheels measuring 30 to 42 cm in diameter, whether or not assembled (kg).
- 8716.90.50.46 Of aluminum (under: Having a diameter of at least 57 cm but not more than 63 cm) (kg).
- 8716.90.50.47 Of steel (under: Having a diameter of at least 57 cm but not more than 63 cm) (kg).
- 8716.90.50.48 Other wheels (under: Wheels) (kg).
- 8716.90.50.56 Wheels with tires for off-the-highway use (kg).
- 8716.90.50.59 Wheels with other tires (under: Wheels with tires) (kg).
- 8716.90.50.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.