HTS Heading 8801

Balloons and dirigibles; gliders, hang gliders and other non-powered aircraft

All 3 HTS codes under heading 8801 (balloons and dirigibles), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8801

  • 8801.00.00 Balloons and dirigibles; gliders, hang gliders and other non-powered aircraft: General Free; Special none; Column 2 50%.
  • 8801.00.00.10 Hang gliders (under: Gliders and hang gliders) (No.).
  • 8801.00.00.20 Gliders (under: Gliders and hang gliders) (No.).
  • 8801.00.00.50 Other (under: Balloons and dirigibles; gliders, hang gliders and other non-powered aircraft) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.