HTS Heading 8802
Other aircraft (for example, helicopters, airplanes, except unmanned aircraft of heading 8806); spacecraft (including satellites) and suborbital and spacecraft launch vehicles
All 36 HTS codes under heading 8802 (other aircraft), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8802
- 8802 Other aircraft (for example, helicopters, airplanes, except unmanned aircraft of heading 8806); spacecraft (including satellites) and suborbital and spacecraft launch vehicles.
- 8802.11.01 Of an unladen weight not exceeding 2,000 kg: General Free; Special none; Column 2 30%.
- 8802.11.01.15 Military (under: New) (No.).
- 8802.11.01.30 Of an unladen weight not exceeding 998 kg (No.).
- 8802.11.01.45 Of an unladen weight exceeding 998 but not exceeding 2,000 kg (No.).
- 8802.11.01.60 Military (under: Used or rebuilt) (No.).
- 8802.11.01.90 Other (under: Used or rebuilt) (No.).
- 8802.12.01 Of an unladen weight exceeding 2,000 kg: General Free; Special none; Column 2 30%.
- 8802.12.01.20 Military (under: New) (No.).
- 8802.12.01.40 Other (under: New) (No.).
- 8802.12.01.60 Military (under: Used or rebuilt) (No.).
- 8802.12.01.80 Other (under: Used or rebuilt) (No.).
- 8802.20.01 Airplanes and other aircraft, of an unladen weight not exceeding 2,000 kg: General Free; Special none; Column 2 30%.
- 8802.20.01.15 Of an unladen weight not exceeding 450 kg (No.).
- 8802.20.01.20 Airplanes (under: Military aircraft) (No.).
- 8802.20.01.30 Other aircraft (under: Military aircraft) (No.).
- 8802.20.01.40 Single engine airplanes (under: Other) (No.).
- 8802.20.01.50 Multiple engine airplanes (under: Other) (No.).
- 8802.20.01.60 Other aircraft (under: Other) (No.).
- 8802.20.01.70 Military aircraft (under: Used or rebuilt) (No.).
- 8802.20.01.80 Other aircraft (under: Used or rebuilt) (No.).
- 8802.30.01 Airplanes and other aircraft, of an unladen weight exceeding 2,000 kg but not exceeding 15,000 kg: General Free; Special none; Column 2 30%.
- 8802.30.01.10 Fighters (under: Military aircraft) (No.).
- 8802.30.01.20 Other (under: Military aircraft) (No.).
- 8802.30.01.30 Of an unladen weight exceeding 2,000 but not exceeding 4,536 kg (No.).
- 8802.30.01.40 Turbofan powered (under: Of an unladen weight exceeding 4,536 but not exceeding 15,000 kg) (No.).
- 8802.30.01.50 Other (under: Of an unladen weight exceeding 4,536 but not exceeding 15,000 kg) (No.).
- 8802.30.01.60 Other (under: Other) (No.).
- 8802.30.01.70 Military aircraft (under: Used or rebuilt) (No.).
- 8802.30.01.80 Other aircraft (under: Used or rebuilt) (No.).
- 8802.40.01 Airplanes and other aircraft, of an unladen weight exceeding 15,000 kg: General Free; Special none; Column 2 30%.
- 8802.40.01.15 Fighters (under: Military aircraft) (No.).
- 8802.40.01.20 Cargo transports (under: Military aircraft) (No.).
- 8802.40.01.30 Other (under: Military aircraft) (No.).
- 8802.40.01.40 Passenger transports (under: Other) (No.).
- 8802.40.01.60 Cargo transports (under: Other) (No.).
- 8802.40.01.70 Other (including passenger/cargo combinations) (No.).
- 8802.40.01.80 Military aircraft (under: Used or rebuilt) (No.).
- 8802.40.01.90 Other aircraft (under: Used or rebuilt) (No.).
- 8802.60 Spacecraft (including satellites) and suborbital and spacecraft launch vehicles.
- 8802.60.30.00 Communications satellites (under: Spacecraft (including satellites) and suborbital and spacecraft launch vehicles) (No.): General Free; Special none; Column 2 Free.
- 8802.60.90 Other (under: Spacecraft (including satellites) and suborbital and spacecraft launch vehicles): General Free; Special none; Column 2 27.5%.
- 8802.60.90.20 Military (under: Other) (No.).
- 8802.60.90.40 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.