HTS Chapter 88
Aircraft, spacecraft, and parts thereof
The 6 headings and 67 HTS codes of chapter 88 (aircraft, spacecraft, and parts thereof), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 88
- 8801: Balloons and dirigibles; gliders, hang gliders and other non-powered aircraft (3 codes, General duty Free)
- 8802: Other aircraft (for example, helicopters, airplanes, except unmanned aircraft of heading 8806); spacecraft (including satellites) and suborbital and spacecraft launch vehicles (36 codes, General duty Free)
- 8804: Parachutes (including dirigible parachutes and paragliders) and rotochutes; parts thereof and accessories thereto (1 code, General duty 3%)
- 8805: Aircraft launching gear; deck-arrestor or similar gear; ground flying trainers; parts of the foregoing articles (3 codes, General duty Free)
- 8806: Unmanned aircraft (11 codes, General duty Free)
- 8807: Parts of goods of heading 8801, 8802 or 8806 (13 codes, General duty Free)
Where it sits in the schedule
Chapter 88 is in Section XVII of the Harmonized System, vehicles, aircraft and vessels (chapters 86 to 89). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.