HTS Heading 8805

Aircraft launching gear; deck-arrestor or similar gear; ground flying trainers; parts of the foregoing articles

All 3 HTS codes under heading 8805 (aircraft launching gear), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8805

  • 8805 Aircraft launching gear; deck-arrestor or similar gear; ground flying trainers; parts of the foregoing articles.
  • 8805.10.00.00 Aircraft launching gear and parts thereof; deck- arrestors or similar gear and parts thereof (kg): General Free; Special none; Column 2 35%.
  • 8805.21.00.00 Air combat simulators and parts thereof (kg): General Free; Special none; Column 2 35%.
  • 8805.29.00.00 Other (under: Ground flying trainers and parts thereof) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.