HTS Heading 8806
Unmanned aircraft
All 11 HTS codes under heading 8806 (unmanned aircraft), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8806
- 8806 Unmanned aircraft.
- 8806.10.00.00 Designed for the carriage of passengers (No.): General Free; Special none; Column 2 30%.
- 8806.21.00.00 With maximum take-off weight not more than 250 g (No.): General Free; Special none; Column 2 30%.
- 8806.22.00.00 With maximum take-off weight more than 250 g but not more than 7 kg (No.): General Free; Special none; Column 2 30%.
- 8806.23.00.00 With maximum take-off weight more than 7 kg but not more than 25 kg (No.): General Free; Special none; Column 2 30%.
- 8806.24.00.00 With maximum take-off weight more than 25 kg but not more than 150 kg (No.): General Free; Special none; Column 2 30%.
- 8806.29.00.00 Other (under: Other, for remote-controlled flight only) (No.): General Free; Special none; Column 2 30%.
- 8806.91.00.00 With maximum take-off weight not more than 250 g (No.): General Free; Special none; Column 2 30%.
- 8806.92.00.00 With maximum take-off weight more than 250 g but not more than 7 kg (No.): General Free; Special none; Column 2 30%.
- 8806.93.00.00 With maximum take-off weight more than 7 kg but not more than 25 kg (No.): General Free; Special none; Column 2 30%.
- 8806.94.00.00 With maximum take-off weight more than 25 kg but not more than 150 kg (No.): General Free; Special none; Column 2 30%.
- 8806.99.00.00 Other (under: Other) (No.): General Free; Special none; Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.