HTS Heading 9008
Image projectors, other than cinematographic; photographic (other than cinematographic) enlargers and reducers; parts and accessories thereof
All 7 HTS codes under heading 9008 (image projectors, other than cinematographic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7%.
Every line of heading 9008
- 9008 Image projectors, other than cinematographic; photographic (other than cinematographic) enlargers and reducers; parts and accessories thereof.
- 9008.50 Projectors, enlargers and reducers.
- 9008.50.10.00 Slide projectors (under: Projectors, enlargers and reducers) (No.): General 7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9008.50.20.00 Capable of producing copies (under: Microfilm, microfiche or other microform readers, whether or not capable of producing copies) (No.): General Free; Special none; Column 2 35%.
- 9008.50.30.00 Other (under: Microfilm, microfiche or other microform readers, whether or not capable of producing copies) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9008.50.40.00 Other image projectors (under: Projectors, enlargers and reducers) (No.): General 4.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9008.50.50.00 Photographic (other than cinematographic) enlargers and reducers (No.): General Free; Special none; Column 2 20%.
- 9008.90 Parts and accessories (under: Image projectors, other than cinematographic; photographic (other than cinematographic) enlargers and reducers; parts and accessories thereof).
- 9008.90.40.00 Of image projectors, other than cinematographic (kg): General Free; Special none; Column 2 35%.
- 9008.90.80.00 Other (under: Parts and accessories) (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.