HTS Heading 9010
Apparatus and equipment for photographic (including cinematographic) laboratories, not specified or included elsewhere in this chapter; negatoscopes; projection screens; parts and accessories thereof
All 10 HTS codes under heading 9010 (apparatus and equipment for photographic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%.
Every line of heading 9010
- 9010 Apparatus and equipment for photographic (including cinematographic) laboratories, not specified or included elsewhere in this chapter; negatoscopes; projection screens; parts and accessories thereof.
- 9010.10.00.00 Apparatus and equipment for automatically developing photographic (including cinematographic) film or paper in rolls or for automatically exposing developed film to rolls of photographic paper (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9010.50 Other apparatus and equipment for photographic (including cinematographic) laboratories; negatoscopes.
- 9010.50.10.00 Contact printers (under: Other apparatus and equipment for photographic (including cinematographic) laboratories; negatoscopes) (No.): General Free; Special none; Column 2 35%.
- 9010.50.20.00 Developing tanks (under: Other apparatus and equipment for photographic (including cinematographic) laboratories; negatoscopes) (No.): General Free; Special none; Column 2 45%.
- 9010.50.30.00 Editors and combination editor-splicers, for cinematographic film (No.): General Free; Special none; Column 2 45%.
- 9010.50.40.00 Other (under: Articles containing an optical lens or designed to contain such a lens) (kg): General Free; Special none; Column 2 45%.
- 9010.50.50.00 Other (under: Photographic film viewers, titlers, splicers and editors, all the foregoing and combinations thereof) (kg): General Free; Special none; Column 2 35%.
- 9010.50.60.00 Other (under: Other apparatus and equipment for photographic (including cinematographic) laboratories; negatoscopes) (kg): General Free; Special none; Column 2 35%.
- 9010.60.00.00 Projection screens (under: Apparatus and equipment for photographic (including cinematographic) laboratories, not specified or included elsewhere in this chapter; negatoscopes; projection screens; parts and accessories thereof) (No.): General Free; Special none; Column 2 50%.
- 9010.90 Parts and accessories (under: Apparatus and equipment for photographic (including cinematographic) laboratories, not specified or included elsewhere in this chapter; negatoscopes; projection screens; parts and accessories thereof).
- 9010.90.85.00 Parts and accessories of articles of subheadings 9010.50 and 9010.60 (kg): General Free; Special none; Column 2 45%.
- 9010.90.95.00 Other (under: Parts and accessories) (kg): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.