HTS Heading 9101
Wrist watches, pocket watches and other watches, including stop watches, with case of precious metal or of metal clad with precious metal
All 26 HTS codes under heading 9101 (wrist watches), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.1%.
Every line of heading 9101
- 9101 Wrist watches, pocket watches and other watches, including stop watches, with case of precious metal or of metal clad with precious metal.
- 9101.11 With mechanical display only (under: Wrist watches, electrically operated, whether or not incorporating a stop watch facility).
- 9101.11.40 Having no jewels or only one jewel in the movement: General 51¢ each + 6.25% on the case and strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,R,S, SG); Column 2 $2.25 each + 45% on the case +80% on the strap, band or bracelet + 35% on the battery.
- 9101.11.80 Other (under: With mechanical display only): General 87¢ each + 6.25% on the case and strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,R,S, SG); Column 2 $3.25 each + 45% on the case +80% on the strap, band or bracelet + 35% on the battery.
- 9101.19 Other (under: Wrist watches, electrically operated, whether or not incorporating a stop watch facility).
- 9101.19.20 With opto-electronic display only.: General Free; Special none; Column 2 35%.
- 9101.19.20.20 Of textile material or of base metal, whether or not gold- or silver-plated (No.).
- 9101.19.20.40 Other (under: Straps, bands or bracelets entered with watches of subheading 9101.19.20 and classifiable therewith pursuant to additional U.S. note 2 to this chapter; all the foregoing whether or not attached to such watches at the time of entry) (No.).
- 9101.19.20.80 Other (under: With opto-electronic display only.) (No.).
- 9101.19.40 Other, having no jewels or only one jewel in the movement: General 41¢ each + 5% on case and strap, band or bracelet + 4.2% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $2.25 each + 45% on the case +80% on the strap, band or bracelet + 35% on the battery.
- 9101.19.80 Other (under: Other): General 61¢ each + 4.4% on case and strap, band or bracelet + 3.7% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $3.25 each + 45% on the case +80% on the strap, band or bracelet + 35% on the battery.
- 9101.21 With automatic winding (under: Other wrist watches, whether or not incorporating a stop watch facility).
- 9101.21.10.00 Of textile material or of base metal, whether or not gold- or silver-plated (No.): General 3.1%; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 80%.
- 9101.21.30.00 Other (under: Straps, bands or bracelets entered with watches of subheading 9101.21.50 and classifiable therewith pursuant to additional U.S. note 2 to this chapter; all the foregoing whether or not attached to such watches at the time of entry) (No.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 80%.
- 9101.21.50 Other (under: Having over 17 jewels in the movement): General Free; Special none; Column 2 $11.50 each + 45% on the case.
- 9101.21.80 Other (under: With automatic winding): General $1.61 each + 4.4% on the case and strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $5.75 each + 45% on the case +80% on the strap, band or bracelet.
- 9101.29 Other (under: Other wrist watches, whether or not incorporating a stop watch facility).
- 9101.29.10 Having no jewels or only one jewel in the movement: General 40¢ each + 5% on the case and strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,R,S, SG); Column 2 $2.25 each + 45% on the case +80% on the strap, band or bracelet.
- 9101.29.20 Having over 1 jewel but not over 7 jewels in the movement: General 61¢ each + 4.4% on the case and strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,R,S, SG); Column 2 $3.25 each + 45% on the case +80% on the strap, band or bracelet.
- 9101.29.30 With movement measuring not over 15.2 mm: General $2.28 each + 5% on the case and strap, band or bracelet; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.75 each + 45% on the case + 80% on the strap, band or bracelet.
- 9101.29.40 With movement measuring over 15.2 mm: General $1.92 each + 5% on the case and strap, band or bracelet; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.75 each + 45% on the case + 80% on the strap, band or bracelet.
- 9101.29.50 With movement valued over $15 each: General 90¢ each + 4.4% on the case and strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,R,S, SG); Column 2 $4.75 each + 45% on the case + 80% on the strap, band or bracelet.
- 9101.29.70.00 Of textile material or of base metal, whether or not gold- or silver-plated (No.): General 3.1%; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P, PA,PE,R,S,SG); Column 2 80%.
- 9101.29.80.00 Other (under: Straps, bands or bracelets entered with watches of subheading 9101.29.90 and classifiable therewith pursuant to additional U.S. note 2 to this chapter; all the foregoing whether or not attached to such watches at the time of entry) (No.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 80%.
- 9101.29.90 Other (under: Having over 17 jewels in the movement): General Free; Special none; Column 2 $11.50 each + 45% on the case.
- 9101.91 Electrically operated (under: Other).
- 9101.91.20.00 With opto-electronic display only (No.): General Free; Special none; Column 2 35%.
- 9101.91.40 Having no jewels or only one jewel in the movement: General Free; Special none; Column 2 $2.25 each + 45% on the case + 35% on the battery.
- 9101.91.80 Other (under: Other): General Free; Special none; Column 2 $3.25 each + 45% on the case + 35% on the battery.
- 9101.99 Other (under: Other).
- 9101.99.20 Having no jewels or not over 7 jewels in the movement: General Free; Special none; Column 2 $2.25 each + 45% on the case.
- 9101.99.40 With movement valued not over $15 each: General 98¢ each + 3% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.75 each + 45% on the case.
- 9101.99.60 With movement valued over $15 each: General Free; Special none; Column 2 $4.75 each + 45% on the case.
- 9101.99.80 Having over 17 jewels in the movement: General Free; Special none; Column 2 $11.50 each + 45% on the case.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.