HTS Heading 9102
Wrist watches, pocket watches and other watches, including stop watches, other than those of heading 9101
All 41 HTS codes under heading 9102 (wrist watches), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14%.
Every line of heading 9102
- 9102 Wrist watches, pocket watches and other watches, including stop watches, other than those of heading 9101.
- 9102.11 With mechanical display only (under: Wrist watches, electrically operated, whether or not incorporating a stop watch facility).
- 9102.11.10 With gold- or silver-plated case: General 44¢ each + 6% on the case + 14% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.90 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.11.25 Other (under: With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated): General 40¢ each + 8.5% on the case + 14% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.11.30 With gold- or silver-plated case: General 44¢ each + 6% on the case + 2.8% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.90 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.11.45 Other (under: Other): General 40¢ each + 8.5% on the case + 2.8% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.11.50 With gold- or silver-plated case: General 80¢ each + 6% on the case + 14% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.90 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.11.65 Other (under: With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated): General 76¢ each + 8.5% on the case + 14% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.11.70 With gold- or silver-plated case: General 80¢ each + 6% on the case + 2.8% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.90 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.11.95 Other (under: Other): General 76¢ each + 8.5% on the case + 2.8% on the strap, band or bracelet + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.12 With opto-electronic display only.
- 9102.12.20.00 Of textile material or of base metal, whether or not gold- or silver-plated (No.): General Free; Special none; Column 2 35%.
- 9102.12.40.00 Other (under: Straps, bands or bracelets entered with watches of subheading 9102.12.80 and classifiable therewith pursuant to additional U.S. note 2 to this chapter; all the foregoing whether or not attached to such watches at the time of entry) (No.): General Free; Special none; Column 2 35%.
- 9102.12.80.00 Other (under: With opto-electronic display only) (No.): General Free; Special none; Column 2 35%.
- 9102.19 Other (under: Wrist watches, electrically operated, whether or not incorporating a stop watch facility).
- 9102.19.20 With strap, band or bracelet of textile material or of base metal, whether or not gold-or silver-plated: General 32¢ each + 4.8% on the case + 11% on the strap, band or bracelet + 4.2% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.19.40 Other (under: Having no jewels or only one jewel in the movement): General 32¢ each + 4.8% on the case + 2.2% on the strap, band or bracelet + 4.2% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.19.60 With strap, band or bracelet of textile material or of base metal, whether or not gold-or silver-plated: General 57¢ each + 4.5% on the case + 10.6% on the strap, band or bracelet + 4% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.70 each + 45% on the case + 110% on the strap, band or bracelet + 35% on the battery.
- 9102.19.80 Other (under: Other): General 57¢ each + 4.5% on the case + 2.1% on the strap, band or bracelet + 4% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 35% on the strap, band or bracelet + 35% on the battery.
- 9102.21 With automatic winding (under: Other wrist watches, whether or not incorporating a stop watch facility).
- 9102.21.10 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated: General 75¢ each + 6% on the case + 14% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.21.25 Other (under: Having no jewels or only one jewel in the movement): General 75¢ each + 6% on the case + 2.8% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.21.30 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated: General $1.75 each + 4.8% on the case + 11.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $5.20 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.21.50 Other (under: Having over one jewel but not over 17 jewels in the movement): General $1.75 each + 4.8% on the case + 2.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $5.20 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.21.70 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated: General $1.53 each + 4.2% on the case + 9.8% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.95 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.21.90 Other (under: Having over 17 jewels in the movement): General $1.53 each + 4.2% on the case + 2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.95 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29 Other (under: Other wrist watches, whether or not incorporating a stop watch facility).
- 9102.29.02.00 Straps, bands or bracelets entered with watches of subheading 9102.29.04 and classifiable therewith pursuant to additional U.S. note 2 to this chapter; all the foregoing whether or not attached to such watches at the time of entry (No.): General 14%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 110%.
- 9102.29.04 Other (under: With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated): General 40¢ each + 6% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case.
- 9102.29.10 Other (under: Having no jewels or only one jewel in the movement): General 40¢ each + 6% on the case + 2.8% on the strap, band or bracelet; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29.15 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated: General 58¢ each + 4.6% on the case + 10.6% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.29.20 Other (under: Having over one jewel but not over 7 jewels in the movement): General 56¢ each + 4.4% on the case + 2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.70 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29.25 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver- plated: General $2.19 each + 4.8% on the case + 11.2% on the strap, band or bracelet; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.29.30 Other (under: With movement measuring not over 15.2 mm): General $2.19 each + 4.8% on the case + 2.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29.35 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver- plated: General $1.61 each + 4.2% on the case + 9.8% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $4.20 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.29.40 Other (under: With movement measuring over 15.2 mm): General $1.83 each + 4.8% on the case + 2.2% on the strap, band or bracelet; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29.45 With strap, band or bracelet of textile material or of base metal, whether or not gold- or silver-plated: General 93¢ each + 4.8% on the case + 11.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.29.50 Other (under: With movement valued over $15 each): General 93¢ each + 4.8% on the case + 2.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.29.55 With strap, band or bracelet of textile material or of base metal, whether or not gold-or silver-plated: General $1.55 each + 4.2% on the case + 9.9% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.95 each + 45% on the case + 110% on the strap, band or bracelet.
- 9102.29.60 Other (under: Having over 17 jewels in the movement): General $1.75 each + 4.8% on the case + 2.2% on the strap, band or bracelet; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.95 each + 45% on the case + 35% on the strap, band or bracelet.
- 9102.91 Electrically operated (under: Other).
- 9102.91.20 With opto-electronic display only: General 3.9% on the movement and case + 5.3% on the battery; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 35%.
- 9102.91.40 Having no jewels or only one jewel in the movement: General 40¢ each + 6% on the case + 5.3% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case + 35% on the battery.
- 9102.91.80 Other (under: Other): General 76¢ each + 6% on the case + 5.3% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $2.70 each + 45% on the case + 35% on thebattery.
- 9102.99 Other (under: Other).
- 9102.99.20 Having no jewels or not over 7 jewels in the movement: General 20¢ each + 3% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.70 each + 45% on the case.
- 9102.99.40 With movement valued not over $15 each: General 92¢ each + 3% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case.
- 9102.99.60 With movement valued over $15 each: General $1.16 each + 6% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4.20 each + 45% on the case.
- 9102.99.80 Having over 17 jewels in the movement: General $2.19 each + 6% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $10.95 each + 45% on the case.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.